A. D. Lucia, M. D. Penta, Silvio Stefanucci, Gabriele Venturi
{"title":"大规模维护过程的早期工作量估计","authors":"A. D. Lucia, M. D. Penta, Silvio Stefanucci, Gabriele Venturi","doi":"10.1109/ICSM.2002.1167771","DOIUrl":null,"url":null,"abstract":"Effort estimation is a valuable asset to managers in planning maintenance activities and performing cost/benefit analysis. Early estimates and accurate evaluations permit to significantly reduce project risks and to improve resource scheduling. In this paper we present an approach for an early effort estimation based on the knowledge of a fraction of the programs composing the work-packet. As a case study, the proposed approach has been applied to a large massive maintenance project performed by a major international software enterprise.","PeriodicalId":385190,"journal":{"name":"International Conference on Software Maintenance, 2002. Proceedings.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2002-10-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"16","resultStr":"{\"title\":\"Early effort estimation of massive maintenance processes\",\"authors\":\"A. D. Lucia, M. D. Penta, Silvio Stefanucci, Gabriele Venturi\",\"doi\":\"10.1109/ICSM.2002.1167771\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Effort estimation is a valuable asset to managers in planning maintenance activities and performing cost/benefit analysis. Early estimates and accurate evaluations permit to significantly reduce project risks and to improve resource scheduling. In this paper we present an approach for an early effort estimation based on the knowledge of a fraction of the programs composing the work-packet. As a case study, the proposed approach has been applied to a large massive maintenance project performed by a major international software enterprise.\",\"PeriodicalId\":385190,\"journal\":{\"name\":\"International Conference on Software Maintenance, 2002. Proceedings.\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2002-10-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"16\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Conference on Software Maintenance, 2002. Proceedings.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICSM.2002.1167771\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Conference on Software Maintenance, 2002. Proceedings.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSM.2002.1167771","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 16

摘要

在计划维护活动和执行成本/收益分析时,工作量估算是管理人员的宝贵资产。早期的估计和准确的评估可以显著地降低项目风险并改进资源调度。在本文中,我们提出了一种基于组成工作包的一小部分程序知识的早期工作量估计方法。作为一个案例研究,所提出的方法已经应用于一个大型国际软件企业执行的大规模维护项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Early effort estimation of massive maintenance processes
Effort estimation is a valuable asset to managers in planning maintenance activities and performing cost/benefit analysis. Early estimates and accurate evaluations permit to significantly reduce project risks and to improve resource scheduling. In this paper we present an approach for an early effort estimation based on the knowledge of a fraction of the programs composing the work-packet. As a case study, the proposed approach has been applied to a large massive maintenance project performed by a major international software enterprise.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An algorithm to compare OO-conceptual schemas From legacy to Web through interaction modeling Union slices for program maintenance Putting escape analysis to work for software testing Corrective Maintenance Maturity Model: Problem Management
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1