部署数字化变电站:在北美有数字化变电站试点经验

H. Vardhan, R. Ramlachan, Wojciech Szela, Edward Gdowik
{"title":"部署数字化变电站:在北美有数字化变电站试点经验","authors":"H. Vardhan, R. Ramlachan, Wojciech Szela, Edward Gdowik","doi":"10.1109/CPRE.2018.8349795","DOIUrl":null,"url":null,"abstract":"Though IEC 61850 GOOSE has been in use for a while for various applications such as controls, interlocking, blocking etc. with substations across the world running successfully in a multi-vendor environment but IEC 61850-9-2 Sampled values and switched Ethernet process bus have yet to gain popularity. The use of NCITs (Non-Conventional Instrument transformers) have been limited to some niche application so far, such as measuring GICs, Open Phase detection, measuring very low magnitude AC, measuring DC etc. Introduction of IEC 61850 process bus and availability of NCITs have led to the way to real word deployment of Digital Substations. There have been several papers published and studies done on the design benefits and various tangible and non-tangible savings attained in digital substations as compared to Conventional Substations. This has interested utilities across the world to start deploying digital substations as pilot projects to realize the real-time benefits, understand the difficulties or ease to deploy such systems and have practical experience while comparing digital substation to a conventional system. This paper discusses PECOs perspective in deploying one of the first digital substation pilot projects in North America. The pilot project is installed on a 230kV line connected to the ring bus managed by PECO, Philadelphia. The main aim of the project is to evaluate and learn the state of the art digital substation technology and compare the various aspects to a conventional substation. The project involves primary optical sensors, merging Units, Protection IEDs supporting 9-2LE, IEEE 1588 Clocks, Substation Servers and Substation hardened Ethernet switches.","PeriodicalId":285875,"journal":{"name":"2018 71st Annual Conference for Protective Relay Engineers (CPRE)","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"Deploying digital substations: Experience with a digital substation pilot in North America\",\"authors\":\"H. Vardhan, R. Ramlachan, Wojciech Szela, Edward Gdowik\",\"doi\":\"10.1109/CPRE.2018.8349795\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Though IEC 61850 GOOSE has been in use for a while for various applications such as controls, interlocking, blocking etc. with substations across the world running successfully in a multi-vendor environment but IEC 61850-9-2 Sampled values and switched Ethernet process bus have yet to gain popularity. The use of NCITs (Non-Conventional Instrument transformers) have been limited to some niche application so far, such as measuring GICs, Open Phase detection, measuring very low magnitude AC, measuring DC etc. Introduction of IEC 61850 process bus and availability of NCITs have led to the way to real word deployment of Digital Substations. There have been several papers published and studies done on the design benefits and various tangible and non-tangible savings attained in digital substations as compared to Conventional Substations. This has interested utilities across the world to start deploying digital substations as pilot projects to realize the real-time benefits, understand the difficulties or ease to deploy such systems and have practical experience while comparing digital substation to a conventional system. This paper discusses PECOs perspective in deploying one of the first digital substation pilot projects in North America. The pilot project is installed on a 230kV line connected to the ring bus managed by PECO, Philadelphia. The main aim of the project is to evaluate and learn the state of the art digital substation technology and compare the various aspects to a conventional substation. The project involves primary optical sensors, merging Units, Protection IEDs supporting 9-2LE, IEEE 1588 Clocks, Substation Servers and Substation hardened Ethernet switches.\",\"PeriodicalId\":285875,\"journal\":{\"name\":\"2018 71st Annual Conference for Protective Relay Engineers (CPRE)\",\"volume\":\"16 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 71st Annual Conference for Protective Relay Engineers (CPRE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CPRE.2018.8349795\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 71st Annual Conference for Protective Relay Engineers (CPRE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPRE.2018.8349795","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

摘要

虽然IEC 61850 GOOSE已经在各种应用中使用了一段时间,如控制,联锁,阻塞等,世界各地的变电站在多供应商环境中成功运行,但IEC 61850-9-2采样值和交换以太网过程总线尚未普及。到目前为止,ncit(非常规仪表变压器)的使用仅限于一些小众应用,例如测量gic,开相检测,测量极低量级的交流,测量直流等。IEC 61850过程总线的引入和ncit的可用性为数字变电站的实际部署开辟了道路。与传统变电站相比,数字变电站的设计效益和各种有形和无形的节省已经发表了几篇论文并进行了研究。这使得世界各地的公用事业公司开始部署数字变电站作为试点项目,以实现实时效益,了解部署此类系统的困难或容易程度,并在将数字变电站与传统系统进行比较时获得实践经验。本文讨论了peco在部署北美第一个数字化变电站试点项目中的观点。该试点项目安装在与费城PECO管理的环形母线相连的230kV线路上。该项目的主要目的是评估和学习最先进的数字化变电站技术,并将其与传统变电站的各个方面进行比较。该项目涉及主光学传感器、合并单元、支持9-2LE的保护ied、IEEE 1588时钟、变电站服务器和变电站强化以太网交换机。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Deploying digital substations: Experience with a digital substation pilot in North America
Though IEC 61850 GOOSE has been in use for a while for various applications such as controls, interlocking, blocking etc. with substations across the world running successfully in a multi-vendor environment but IEC 61850-9-2 Sampled values and switched Ethernet process bus have yet to gain popularity. The use of NCITs (Non-Conventional Instrument transformers) have been limited to some niche application so far, such as measuring GICs, Open Phase detection, measuring very low magnitude AC, measuring DC etc. Introduction of IEC 61850 process bus and availability of NCITs have led to the way to real word deployment of Digital Substations. There have been several papers published and studies done on the design benefits and various tangible and non-tangible savings attained in digital substations as compared to Conventional Substations. This has interested utilities across the world to start deploying digital substations as pilot projects to realize the real-time benefits, understand the difficulties or ease to deploy such systems and have practical experience while comparing digital substation to a conventional system. This paper discusses PECOs perspective in deploying one of the first digital substation pilot projects in North America. The pilot project is installed on a 230kV line connected to the ring bus managed by PECO, Philadelphia. The main aim of the project is to evaluate and learn the state of the art digital substation technology and compare the various aspects to a conventional substation. The project involves primary optical sensors, merging Units, Protection IEDs supporting 9-2LE, IEEE 1588 Clocks, Substation Servers and Substation hardened Ethernet switches.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Correlating protective relay reports for system-wide, post-event analysis Back to the basics — Event analysis using symmetrical components Cyber security — Securing the protection and control relay communication in substation Communications assisted islanding detection: Contrasting direct transfer trip and phase comparison methods Applying intelligent fast load shed using IEC 61850 GOOSE
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1