{"title":"价值工程知识管理在价值工程发展中的作用","authors":"Maitha AlKaabi, A. Hamdan, G. Kukreja","doi":"10.4018/978-1-5225-9639-4.CH025","DOIUrl":null,"url":null,"abstract":"The quantitative method was used as the first approach to provide data collected from the construction professionals to measure the study variables (project characteristics, VE knowledge, support of authorized parties, flexibility of the contractual provisions, the resistance to change, the team selection, the results of VE study, the duration of the study, false perceptions and misunderstanding of VE concept) that affecting the successful development of VE in the context of public construction projects in the Kingdom of Bahrain. The second approach was the qualitative method through conducting interviews with specialists and consultants in the field of VE in the construction industry.","PeriodicalId":355657,"journal":{"name":"Handbook of Research on Implementing Knowledge Management Strategy in the Public Sector","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The Role of Value Engineering Knowledge Management on the Value Engineering Development\",\"authors\":\"Maitha AlKaabi, A. Hamdan, G. Kukreja\",\"doi\":\"10.4018/978-1-5225-9639-4.CH025\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The quantitative method was used as the first approach to provide data collected from the construction professionals to measure the study variables (project characteristics, VE knowledge, support of authorized parties, flexibility of the contractual provisions, the resistance to change, the team selection, the results of VE study, the duration of the study, false perceptions and misunderstanding of VE concept) that affecting the successful development of VE in the context of public construction projects in the Kingdom of Bahrain. The second approach was the qualitative method through conducting interviews with specialists and consultants in the field of VE in the construction industry.\",\"PeriodicalId\":355657,\"journal\":{\"name\":\"Handbook of Research on Implementing Knowledge Management Strategy in the Public Sector\",\"volume\":\"14 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Handbook of Research on Implementing Knowledge Management Strategy in the Public Sector\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4018/978-1-5225-9639-4.CH025\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Handbook of Research on Implementing Knowledge Management Strategy in the Public Sector","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/978-1-5225-9639-4.CH025","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

采用定量方法作为第一种方法,提供从建筑专业人员那里收集的数据,以测量研究变量(项目特征、VE知识、授权方的支持、合同条款的灵活性、对变化的抵抗力、团队选择、VE研究结果、研究持续时间、在巴林王国的公共建设项目中,影响VE成功发展的错误观念和对VE概念的误解。第二种方法是定性方法,通过与建筑行业VE领域的专家和顾问进行访谈。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Role of Value Engineering Knowledge Management on the Value Engineering Development
The quantitative method was used as the first approach to provide data collected from the construction professionals to measure the study variables (project characteristics, VE knowledge, support of authorized parties, flexibility of the contractual provisions, the resistance to change, the team selection, the results of VE study, the duration of the study, false perceptions and misunderstanding of VE concept) that affecting the successful development of VE in the context of public construction projects in the Kingdom of Bahrain. The second approach was the qualitative method through conducting interviews with specialists and consultants in the field of VE in the construction industry.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Building a Supportive Culture for Sustained Organizational Learning in Public Sectors Including Project Learning An Explorative Study of Knowledge-Transfer Mechanism Measuring the Impact of Knowledge Management (KM) on Performance in the Public Sector in India The Impact of Project Management Maturity Levels on Project Success in the Construction and Engineering Industry in Bahrain Knowledge Management in the Public Sector
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1