{"title":"了解防砂安装故障","authors":"R. Tibbles, Kesavan Govinathan, I. Mickelburgh, Samyak Jain, Philip Wassouf","doi":"10.2118/199251-ms","DOIUrl":null,"url":null,"abstract":"\n The sand control completion is the last step in the well construction. It is the step that turns the well from an expense to a revenue generating asset. While every sand control completion is designed for success, things don't always go to plan during the installation, and the technical and commercial results are sometimes less than perfect. Failures can range from minor issues that can be easily remedied to catastrophic events that put the entire well, and investment, at risk. Regardless of severity, it is critical that all failures are analyzed to determine the root cause, prevent them from being repeated and protect asset value. The success of a sand control installation should not be assumed and can only be confirmed with a thorough review of all available job data.\n This paper introduces several case studies of failures that occurred during sand control installations and details the investigative process and techniques used to identify the root causes. Examples include events such as screen/wash-pipe damage, bridging, hole collapse, and packer seal failure. This analysis provides key insights into downhole events and mechanisms that can be used to minimize risk and improve future completions.","PeriodicalId":358085,"journal":{"name":"Day 4 Thu, November 05, 2020","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-02-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Understanding Sand Control Installation Failures\",\"authors\":\"R. Tibbles, Kesavan Govinathan, I. Mickelburgh, Samyak Jain, Philip Wassouf\",\"doi\":\"10.2118/199251-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The sand control completion is the last step in the well construction. It is the step that turns the well from an expense to a revenue generating asset. While every sand control completion is designed for success, things don't always go to plan during the installation, and the technical and commercial results are sometimes less than perfect. Failures can range from minor issues that can be easily remedied to catastrophic events that put the entire well, and investment, at risk. Regardless of severity, it is critical that all failures are analyzed to determine the root cause, prevent them from being repeated and protect asset value. The success of a sand control installation should not be assumed and can only be confirmed with a thorough review of all available job data.\\n This paper introduces several case studies of failures that occurred during sand control installations and details the investigative process and techniques used to identify the root causes. Examples include events such as screen/wash-pipe damage, bridging, hole collapse, and packer seal failure. This analysis provides key insights into downhole events and mechanisms that can be used to minimize risk and improve future completions.\",\"PeriodicalId\":358085,\"journal\":{\"name\":\"Day 4 Thu, November 05, 2020\",\"volume\":\"42 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-02-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Thu, November 05, 2020\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/199251-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, November 05, 2020","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/199251-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

防砂完井是油井施工的最后一道工序。这是将油井从一笔开支转变为创收资产的一步。虽然每次防砂完井都是为了成功而设计的,但在安装过程中,事情并不总是按计划进行,技术和商业结果有时并不完美。故障的范围很广,小到可以轻易修复的小问题,大到可能危及整口井和投资的灾难性事件。无论严重程度如何,对所有故障进行分析以确定根本原因,防止它们再次发生并保护资产价值是至关重要的。防砂装置的成功不应该被假设,只能通过对所有可用作业数据的全面审查来确认。本文介绍了在防砂安装过程中发生的几个故障案例,并详细介绍了用于确定根本原因的调查过程和技术。例如筛管/冲洗管损坏、桥接、井眼坍塌和封隔器密封失效等事件。该分析提供了对井下事件和机制的关键见解,可用于降低风险并改善未来的完井作业。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Understanding Sand Control Installation Failures
The sand control completion is the last step in the well construction. It is the step that turns the well from an expense to a revenue generating asset. While every sand control completion is designed for success, things don't always go to plan during the installation, and the technical and commercial results are sometimes less than perfect. Failures can range from minor issues that can be easily remedied to catastrophic events that put the entire well, and investment, at risk. Regardless of severity, it is critical that all failures are analyzed to determine the root cause, prevent them from being repeated and protect asset value. The success of a sand control installation should not be assumed and can only be confirmed with a thorough review of all available job data. This paper introduces several case studies of failures that occurred during sand control installations and details the investigative process and techniques used to identify the root causes. Examples include events such as screen/wash-pipe damage, bridging, hole collapse, and packer seal failure. This analysis provides key insights into downhole events and mechanisms that can be used to minimize risk and improve future completions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Schizophyllan as Potential Environmental Friendly EOR Polymer for A Selected Malaysian Field Structural Health Monitoring of Unbonded Flexible Pipe Using Optical Fiber Sensor Systematic Approach in Testing Field Data Analysis Techniques with an Example of Multiwell Retrospective Testing Deepwater Flowlines and Risers Decommissioning Understanding Sand Control Installation Failures
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1