最小化流程时间的并行机器调度:飞机公司X车削和铣削部门的案例研究

Asep Anwar, Didit Damur Rochman
{"title":"最小化流程时间的并行机器调度:飞机公司X车削和铣削部门的案例研究","authors":"Asep Anwar, Didit Damur Rochman","doi":"10.13189/UJME.2019.071306","DOIUrl":null,"url":null,"abstract":"Company X in 2017 has a delay in the Turning and Milling department of 58% of the total order of 2,334. The actual condition is the number of machines used, namely 5 CNC machines with a production capacity of 230.4 hours / week and the number of work orders from 2013-2018 that must be done is 2767,458 hours. The delay was due to the absence of an appropriate engine scheduling system. Modeling uses mathematical models and runs using lingo software. The results of calculations using LINGO for mathematical models are 14,274 hours with a calculation time of 17 minutes 55 seconds.","PeriodicalId":275027,"journal":{"name":"Universal Journal of Mechanical Engineering","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Parallel Machine Scheduling for Minimizing Flowtime: Case Study at Aircraft Company X Turnin and Milling Departments\",\"authors\":\"Asep Anwar, Didit Damur Rochman\",\"doi\":\"10.13189/UJME.2019.071306\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Company X in 2017 has a delay in the Turning and Milling department of 58% of the total order of 2,334. The actual condition is the number of machines used, namely 5 CNC machines with a production capacity of 230.4 hours / week and the number of work orders from 2013-2018 that must be done is 2767,458 hours. The delay was due to the absence of an appropriate engine scheduling system. Modeling uses mathematical models and runs using lingo software. The results of calculations using LINGO for mathematical models are 14,274 hours with a calculation time of 17 minutes 55 seconds.\",\"PeriodicalId\":275027,\"journal\":{\"name\":\"Universal Journal of Mechanical Engineering\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Universal Journal of Mechanical Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.13189/UJME.2019.071306\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Universal Journal of Mechanical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.13189/UJME.2019.071306","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

X公司2017年车削部的订单延期量占总订单2334台的58%。实际情况是使用机器数量,即5台CNC机床,生产能力为230.4小时/周,2013-2018年必须完成的工单数量为2767458小时。延误是由于缺乏适当的发动机调度系统。建模使用数学模型,并使用lingo软件运行。使用LINGO计算数学模型的结果为14,274小时,计算时间为17分55秒。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Parallel Machine Scheduling for Minimizing Flowtime: Case Study at Aircraft Company X Turnin and Milling Departments
Company X in 2017 has a delay in the Turning and Milling department of 58% of the total order of 2,334. The actual condition is the number of machines used, namely 5 CNC machines with a production capacity of 230.4 hours / week and the number of work orders from 2013-2018 that must be done is 2767,458 hours. The delay was due to the absence of an appropriate engine scheduling system. Modeling uses mathematical models and runs using lingo software. The results of calculations using LINGO for mathematical models are 14,274 hours with a calculation time of 17 minutes 55 seconds.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Heat Transfer in a HfB2 Microchannel Heat Sink: A Numerical Approach Design and Implementation of Highly Robust Gantry-Type and Low-Cost 3D Concrete Printer for Construction Estimating Tire Forces Using MLP Neural Network and LM Algorithm: A Comparative Study Optimization of Quarter Car Suspension Dynamics Using Power Spectral Density of Irregular Road Profile CAD Modelling and Fatigue Analysis of a Wheel Rim Incorporating Finite Element Approach
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1