提出解决方案,以减少影响高层建筑项目施工阶段延误的因素

Trần Phi Tuấn Kiệt, Truong Cong Thuan, Tran Thi Kha
{"title":"提出解决方案,以减少影响高层建筑项目施工阶段延误的因素","authors":"Trần Phi Tuấn Kiệt, Truong Cong Thuan, Tran Thi Kha","doi":"10.26480/jtin.02.2022.34.36","DOIUrl":null,"url":null,"abstract":"Along with the rapid development of the construction industry in recent years, high-rise projects have grown in both quantity and scale. However, delays are common in this type of project in developing countries. It causes significant economic damage and has a very serious impact on investor confidence. Following a previous study on factors affecting the delay of construction phase in high-rise building projects, this study will propose solutions to reduce the factors mentioned in the previous study. Nine groups of solutions corresponding to nine groups of factors will be analyzed in this study. The investor chooses a designer and project management consultant who has expertise, experience and is suitable for the project; the investor clearly determined the scale and purpose of using the project; skilled labor and suitable construction methods; provide adequate and timely materials; the investor has to confirm the contractor’s capacity are suggested as mitigation activities. The results could help stakeholders learn from the mentioned factors and apply solutions so that they can avoid delays.","PeriodicalId":385957,"journal":{"name":"JOURNAL OF TECHNOLOGY & INNOVATION","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"PROPOSING SOLUTIONS TO REDUCE FACTORS AFFECTING THE DELAY OF CONSTRUCTION PHASE IN HIGH-RISE BUILDING PROJECTS\",\"authors\":\"Trần Phi Tuấn Kiệt, Truong Cong Thuan, Tran Thi Kha\",\"doi\":\"10.26480/jtin.02.2022.34.36\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Along with the rapid development of the construction industry in recent years, high-rise projects have grown in both quantity and scale. However, delays are common in this type of project in developing countries. It causes significant economic damage and has a very serious impact on investor confidence. Following a previous study on factors affecting the delay of construction phase in high-rise building projects, this study will propose solutions to reduce the factors mentioned in the previous study. Nine groups of solutions corresponding to nine groups of factors will be analyzed in this study. The investor chooses a designer and project management consultant who has expertise, experience and is suitable for the project; the investor clearly determined the scale and purpose of using the project; skilled labor and suitable construction methods; provide adequate and timely materials; the investor has to confirm the contractor’s capacity are suggested as mitigation activities. The results could help stakeholders learn from the mentioned factors and apply solutions so that they can avoid delays.\",\"PeriodicalId\":385957,\"journal\":{\"name\":\"JOURNAL OF TECHNOLOGY & INNOVATION\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JOURNAL OF TECHNOLOGY & INNOVATION\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.26480/jtin.02.2022.34.36\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JOURNAL OF TECHNOLOGY & INNOVATION","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26480/jtin.02.2022.34.36","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

近年来,随着建筑业的快速发展,高层建筑的数量和规模都在不断增长。然而,在发展中国家,这类项目的延误是很常见的。它造成了重大的经济损失,并对投资者信心产生了非常严重的影响。在之前对高层建筑项目施工阶段延迟的影响因素进行研究的基础上,本研究将提出减少前人研究中提到的因素的解决方案。本研究将分析九组因素对应的九组解决方案。投资方选择具有专业知识、经验、适合项目的设计师和项目管理顾问;投资方明确确定项目的使用规模和用途;熟练的劳动力和合适的施工方法;提供充足和及时的材料;投资者必须确认承包商的能力是否被建议为缓解活动。结果可以帮助利益相关者从上述因素中学习并应用解决方案,从而避免延误。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
PROPOSING SOLUTIONS TO REDUCE FACTORS AFFECTING THE DELAY OF CONSTRUCTION PHASE IN HIGH-RISE BUILDING PROJECTS
Along with the rapid development of the construction industry in recent years, high-rise projects have grown in both quantity and scale. However, delays are common in this type of project in developing countries. It causes significant economic damage and has a very serious impact on investor confidence. Following a previous study on factors affecting the delay of construction phase in high-rise building projects, this study will propose solutions to reduce the factors mentioned in the previous study. Nine groups of solutions corresponding to nine groups of factors will be analyzed in this study. The investor chooses a designer and project management consultant who has expertise, experience and is suitable for the project; the investor clearly determined the scale and purpose of using the project; skilled labor and suitable construction methods; provide adequate and timely materials; the investor has to confirm the contractor’s capacity are suggested as mitigation activities. The results could help stakeholders learn from the mentioned factors and apply solutions so that they can avoid delays.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
SEISMIC TORSIONAL BEHAVIOR OF A TESTED FULL-SCALE STEEL BUILDING CHARACTERISATION AND SPECIFIC MARKERS EXPRESSION OF SOFT TISSUE SARCOMA: CASE REPORTS FOR THE DOG AT THE HO CHI MINH CITY VETERINARY CLINIC PROPOSING SOLUTIONS TO REDUCE FACTORS AFFECTING THE DELAY OF CONSTRUCTION PHASE IN HIGH-RISE BUILDING PROJECTS OPTIMIZATION OF COMPRESSION IGNITION ENGINE FUELLED WITH COTTON SEED BIODIESEL USING DIGLYME AND INJECTION PRESSURE SEASONAL CHANGES OF TOTAL MERCURY IN A MANGROVE LAGOON ECOSYSTEM
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1