数据集的共享、集成、跟踪和维护管理是一项新的、相当复杂的任务

J. Harty, R. Laing
{"title":"数据集的共享、集成、跟踪和维护管理是一项新的、相当复杂的任务","authors":"J. Harty, R. Laing","doi":"10.1109/IV.2010.102","DOIUrl":null,"url":null,"abstract":"With the improved uptake of Building Information Modelling (BIM) new issues are emerging. Prime in these tasks is how it is presented to the various stakeholders, in tailor made views to reflect their demands and requirements. In this fragmented sector strong in the concept of phased handovers new methods of feedback loops need to be developed, and other stakeholders outside the procurement process need to be included to progress and manage the practice. Within this scenario is the role of the facility manager, who currently operates separately to the procurement stakeholders. Bridges need to be built to bring them closer together especially in light of life cycle costing and sustainability if the buildings operations and maintenance issues are to be addressed in the design phase. The model's ability to host work phases or stages opens up a method to co-inhabit the model to accommodate both sets of stakeholders. This filtering of the model has both tremendously positive aspects but conversely larger issues of ownership and custodianship have not to date been satisfactorily resolved. There is a major role for proper management here, which has not been appropriately identified. Initially there was a clarion call to architects to adopt this role and a few years ago this seemed to return the lead role to this noble profession. But patently they are neither prepared nor keen to take on this role. Constructing architects however do seem to want this discipline which can raise their profile and possibly lead to professional recognition and prestige.","PeriodicalId":328464,"journal":{"name":"2010 14th International Conference Information Visualisation","volume":"94 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-07-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"The Management of Sharing, Integrating, Tracking, and Maintaining Data-Sets, is a New and Rather Complex Task\",\"authors\":\"J. Harty, R. Laing\",\"doi\":\"10.1109/IV.2010.102\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With the improved uptake of Building Information Modelling (BIM) new issues are emerging. Prime in these tasks is how it is presented to the various stakeholders, in tailor made views to reflect their demands and requirements. In this fragmented sector strong in the concept of phased handovers new methods of feedback loops need to be developed, and other stakeholders outside the procurement process need to be included to progress and manage the practice. Within this scenario is the role of the facility manager, who currently operates separately to the procurement stakeholders. Bridges need to be built to bring them closer together especially in light of life cycle costing and sustainability if the buildings operations and maintenance issues are to be addressed in the design phase. The model's ability to host work phases or stages opens up a method to co-inhabit the model to accommodate both sets of stakeholders. This filtering of the model has both tremendously positive aspects but conversely larger issues of ownership and custodianship have not to date been satisfactorily resolved. There is a major role for proper management here, which has not been appropriately identified. Initially there was a clarion call to architects to adopt this role and a few years ago this seemed to return the lead role to this noble profession. But patently they are neither prepared nor keen to take on this role. Constructing architects however do seem to want this discipline which can raise their profile and possibly lead to professional recognition and prestige.\",\"PeriodicalId\":328464,\"journal\":{\"name\":\"2010 14th International Conference Information Visualisation\",\"volume\":\"94 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-07-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 14th International Conference Information Visualisation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IV.2010.102\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 14th International Conference Information Visualisation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IV.2010.102","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

随着建筑信息模型(BIM)应用的提高,新的问题也出现了。这些任务中最重要的是如何将其呈现给各种利益相关者,以量身定制的观点来反映他们的需求和要求。在这个支离破碎的行业中,需要制定新的反馈循环方法,并将采购流程之外的其他利益相关者纳入其中,以推进和管理这一做法。在这种情况下,设施经理的角色是独立于采购利益相关者的。如果要在设计阶段解决建筑物的运营和维护问题,需要建造桥梁使它们更紧密地联系在一起,特别是考虑到生命周期成本和可持续性。模型承载工作阶段或阶段的能力开辟了一种方法,可以共同居住在模型中,以容纳两组涉众。这种模式的过滤既有非常积极的方面,但相反,更大的所有权和托管问题迄今尚未得到令人满意的解决。适当的管理在这方面起着重要作用,但这一点还没有得到适当的确认。最初,人们呼吁建筑师承担这一角色,几年前,这个崇高的职业似乎又回到了主导地位。但显然,他们既不准备也不热衷于承担这一角色。然而,建筑建筑师似乎确实希望这门学科能够提高他们的形象,并可能导致专业认可和声望。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Management of Sharing, Integrating, Tracking, and Maintaining Data-Sets, is a New and Rather Complex Task
With the improved uptake of Building Information Modelling (BIM) new issues are emerging. Prime in these tasks is how it is presented to the various stakeholders, in tailor made views to reflect their demands and requirements. In this fragmented sector strong in the concept of phased handovers new methods of feedback loops need to be developed, and other stakeholders outside the procurement process need to be included to progress and manage the practice. Within this scenario is the role of the facility manager, who currently operates separately to the procurement stakeholders. Bridges need to be built to bring them closer together especially in light of life cycle costing and sustainability if the buildings operations and maintenance issues are to be addressed in the design phase. The model's ability to host work phases or stages opens up a method to co-inhabit the model to accommodate both sets of stakeholders. This filtering of the model has both tremendously positive aspects but conversely larger issues of ownership and custodianship have not to date been satisfactorily resolved. There is a major role for proper management here, which has not been appropriately identified. Initially there was a clarion call to architects to adopt this role and a few years ago this seemed to return the lead role to this noble profession. But patently they are neither prepared nor keen to take on this role. Constructing architects however do seem to want this discipline which can raise their profile and possibly lead to professional recognition and prestige.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Semi-automatic Generation of GUIs for RDF Browsing Swedish Road Weather Visualization Visualization of Multi-sensory Meeting Information to Support Awareness Visual Intention in Moving Image Editing and Eye-Tracking Methodology. An Exploratory Study Combining Visual Analytics and Content Based Data Retrieval Technology for Efficient Data Analysis
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1