{"title":"Cemex Victorville工厂的氧气富集","authors":"C.A. Gotro","doi":"10.1109/CITCON.2001.934117","DOIUrl":null,"url":null,"abstract":"This paper outlines the recent efforts undertaken to enhance clinker production from two different kiln system configurations at the Victorville plant, USA. General market conditions in the Southwest US over the last several years have left the plant clinker capacity limited. This brings into play the economic equations for using oxygen to increase production.","PeriodicalId":412513,"journal":{"name":"IEEE-IAS/PCA 2001 Cement Industry Technical Conference. Conference Record (Cat. No.01CH37150)","volume":"354 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-04-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Oxygen enrichment at Cemex's Victorville plant\",\"authors\":\"C.A. Gotro\",\"doi\":\"10.1109/CITCON.2001.934117\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper outlines the recent efforts undertaken to enhance clinker production from two different kiln system configurations at the Victorville plant, USA. General market conditions in the Southwest US over the last several years have left the plant clinker capacity limited. This brings into play the economic equations for using oxygen to increase production.\",\"PeriodicalId\":412513,\"journal\":{\"name\":\"IEEE-IAS/PCA 2001 Cement Industry Technical Conference. Conference Record (Cat. No.01CH37150)\",\"volume\":\"354 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-04-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE-IAS/PCA 2001 Cement Industry Technical Conference. Conference Record (Cat. No.01CH37150)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CITCON.2001.934117\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE-IAS/PCA 2001 Cement Industry Technical Conference. Conference Record (Cat. No.01CH37150)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CITCON.2001.934117","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
This paper outlines the recent efforts undertaken to enhance clinker production from two different kiln system configurations at the Victorville plant, USA. General market conditions in the Southwest US over the last several years have left the plant clinker capacity limited. This brings into play the economic equations for using oxygen to increase production.