{"title":"多处理器软实时调度的随机框架","authors":"A. Mills, James H. Anderson","doi":"10.1109/RTAS.2010.33","DOIUrl":null,"url":null,"abstract":"Prior work has shown that the global earliest-deadline-first (GEDF) scheduling algorithm ensures bounded deadline tardiness on multiprocessors with no utilization loss; therefore, GEDF may be a good candidate scheduling algorithm for soft real-time workloads. However, such workloads are often implemented assuming an average-case provisioning, and in prior tardiness-bound derivations for GEDF, worst-case execution costs are assumed. As worst-case costs can be orders of magnitude higher than average-case costs, using a worst-case provisioning may result in significant wasted processing capacity. In this paper, prior tardiness-bound derivations for GEDF are generalized so that execution times are probabilistic, and a bound on expected (mean) tardiness is derived. It is shown that, as long as the total expected utilization is strictly less than the number of available processors, the expected tardiness of every task is bounded under GEDF. The result also implies that any quantile of the tardiness distribution is also bounded.","PeriodicalId":356388,"journal":{"name":"2010 16th IEEE Real-Time and Embedded Technology and Applications Symposium","volume":"59 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-04-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"50","resultStr":"{\"title\":\"A Stochastic Framework for Multiprocessor Soft Real-Time Scheduling\",\"authors\":\"A. Mills, James H. Anderson\",\"doi\":\"10.1109/RTAS.2010.33\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Prior work has shown that the global earliest-deadline-first (GEDF) scheduling algorithm ensures bounded deadline tardiness on multiprocessors with no utilization loss; therefore, GEDF may be a good candidate scheduling algorithm for soft real-time workloads. However, such workloads are often implemented assuming an average-case provisioning, and in prior tardiness-bound derivations for GEDF, worst-case execution costs are assumed. As worst-case costs can be orders of magnitude higher than average-case costs, using a worst-case provisioning may result in significant wasted processing capacity. In this paper, prior tardiness-bound derivations for GEDF are generalized so that execution times are probabilistic, and a bound on expected (mean) tardiness is derived. It is shown that, as long as the total expected utilization is strictly less than the number of available processors, the expected tardiness of every task is bounded under GEDF. The result also implies that any quantile of the tardiness distribution is also bounded.\",\"PeriodicalId\":356388,\"journal\":{\"name\":\"2010 16th IEEE Real-Time and Embedded Technology and Applications Symposium\",\"volume\":\"59 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-04-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"50\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 16th IEEE Real-Time and Embedded Technology and Applications Symposium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/RTAS.2010.33\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 16th IEEE Real-Time and Embedded Technology and Applications Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RTAS.2010.33","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A Stochastic Framework for Multiprocessor Soft Real-Time Scheduling
Prior work has shown that the global earliest-deadline-first (GEDF) scheduling algorithm ensures bounded deadline tardiness on multiprocessors with no utilization loss; therefore, GEDF may be a good candidate scheduling algorithm for soft real-time workloads. However, such workloads are often implemented assuming an average-case provisioning, and in prior tardiness-bound derivations for GEDF, worst-case execution costs are assumed. As worst-case costs can be orders of magnitude higher than average-case costs, using a worst-case provisioning may result in significant wasted processing capacity. In this paper, prior tardiness-bound derivations for GEDF are generalized so that execution times are probabilistic, and a bound on expected (mean) tardiness is derived. It is shown that, as long as the total expected utilization is strictly less than the number of available processors, the expected tardiness of every task is bounded under GEDF. The result also implies that any quantile of the tardiness distribution is also bounded.