有机肥供应链活动的风险管理

Irine Octaviani, D. Koestiono, A. Aprilia
{"title":"有机肥供应链活动的风险管理","authors":"Irine Octaviani, D. Koestiono, A. Aprilia","doi":"10.14710/agrisocionomics.v4i1.5288","DOIUrl":null,"url":null,"abstract":"Supply chain management is not easy because there are two challenges that must be faced, that is the complexity of the supply chain structure and sudden uncertainty, therefore conditions are vulnerable to various forms of risk. In companies that produce organic fertilizer such as PT. MBA, organic fertilizer supply chain activities have the opportunity to pose risks. The purpose of this research is to identify risks and identify the causes of risk and determine the right strategy to deal with the causes of risk in supply chain activities at PT. MBA. The method used is the House of Risk (HOR) by using five indicators in the SCOR (Supply Chain Operation Reference) model, that is plan, source, manufacture, distribution and return. Risk events are identified and considered priorities, that is delays in receiving raw materials from suppliers, implementation of production not on schedule, no production process activities, unable to meet all requests, decreasing product quality during the process, product quality not in accordance with existing standards and delays product delivery (finished fertilizer) to PT. PKG. The priority risk agent is a risk agent to check inaccurate raw materials. Meanwhile, the handling strategy that is a priority to be implemented, with the hope of being able to prevent the causes of risk is coordination, stock strategy and flexible supply base.","PeriodicalId":184233,"journal":{"name":"Agrisocionomics: Jurnal Sosial Ekonomi Pertanian","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-05-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"RISK MANAGEMENT IN ORGANIC FERTILIZER SUPPLY CHAIN ACTIVITIES\",\"authors\":\"Irine Octaviani, D. Koestiono, A. Aprilia\",\"doi\":\"10.14710/agrisocionomics.v4i1.5288\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Supply chain management is not easy because there are two challenges that must be faced, that is the complexity of the supply chain structure and sudden uncertainty, therefore conditions are vulnerable to various forms of risk. In companies that produce organic fertilizer such as PT. MBA, organic fertilizer supply chain activities have the opportunity to pose risks. The purpose of this research is to identify risks and identify the causes of risk and determine the right strategy to deal with the causes of risk in supply chain activities at PT. MBA. The method used is the House of Risk (HOR) by using five indicators in the SCOR (Supply Chain Operation Reference) model, that is plan, source, manufacture, distribution and return. Risk events are identified and considered priorities, that is delays in receiving raw materials from suppliers, implementation of production not on schedule, no production process activities, unable to meet all requests, decreasing product quality during the process, product quality not in accordance with existing standards and delays product delivery (finished fertilizer) to PT. PKG. The priority risk agent is a risk agent to check inaccurate raw materials. Meanwhile, the handling strategy that is a priority to be implemented, with the hope of being able to prevent the causes of risk is coordination, stock strategy and flexible supply base.\",\"PeriodicalId\":184233,\"journal\":{\"name\":\"Agrisocionomics: Jurnal Sosial Ekonomi Pertanian\",\"volume\":\"19 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-05-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Agrisocionomics: Jurnal Sosial Ekonomi Pertanian\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14710/agrisocionomics.v4i1.5288\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Agrisocionomics: Jurnal Sosial Ekonomi Pertanian","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14710/agrisocionomics.v4i1.5288","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

供应链管理并不容易,因为有两个挑战必须面对,即供应链结构的复杂性和突然的不确定性,因此条件很容易受到各种形式的风险。在PT. MBA等生产有机肥的公司中,有机肥供应链活动有可能带来风险。本研究的目的是识别风险和识别风险的原因,并确定正确的策略来处理在PT. MBA供应链活动中的风险原因。采用SCOR (Supply Chain Operation Reference)模型中的五个指标,即计划、来源、制造、分销和回报,建立风险屋(House of Risk, HOR)模型。识别并考虑风险事件的优先级,即延迟从供应商处接收原材料,不按计划实施生产,没有生产过程活动,无法满足所有要求,在过程中降低产品质量,产品质量不符合现有标准,延迟产品交付(成品肥料)给PT. PKG。优先风险代理是检查不准确原材料的风险代理。同时,协调策略、库存策略和灵活的供应基础是优先实施的处理策略,希望能够防止风险的产生。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
RISK MANAGEMENT IN ORGANIC FERTILIZER SUPPLY CHAIN ACTIVITIES
Supply chain management is not easy because there are two challenges that must be faced, that is the complexity of the supply chain structure and sudden uncertainty, therefore conditions are vulnerable to various forms of risk. In companies that produce organic fertilizer such as PT. MBA, organic fertilizer supply chain activities have the opportunity to pose risks. The purpose of this research is to identify risks and identify the causes of risk and determine the right strategy to deal with the causes of risk in supply chain activities at PT. MBA. The method used is the House of Risk (HOR) by using five indicators in the SCOR (Supply Chain Operation Reference) model, that is plan, source, manufacture, distribution and return. Risk events are identified and considered priorities, that is delays in receiving raw materials from suppliers, implementation of production not on schedule, no production process activities, unable to meet all requests, decreasing product quality during the process, product quality not in accordance with existing standards and delays product delivery (finished fertilizer) to PT. PKG. The priority risk agent is a risk agent to check inaccurate raw materials. Meanwhile, the handling strategy that is a priority to be implemented, with the hope of being able to prevent the causes of risk is coordination, stock strategy and flexible supply base.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
COMMUNITY EMPOWERMENT STRATEGY AROUND FORESTS THROUGH COMMUNITY FOREST MANAGEMENT SYSTEM (PHBM) IN PRINGAPUS DISTRICT SEMARANG DISTRICT FARMER SATISFACTION ANALYSIS ON RICE FARMING INSURANCE PROGRAM IN TEGAL REGENCY THE STRATEGY FOR THE DEVELOPMENT OF KAMPUNG LABU MADU AGROTOURISM IN BESUK HAMLET, TOYORESMI VILLAGE, NGASEM DISTRICT, KEDIRI REGENCY, EAST JAVA PROVINCE, INDONESIA ANALYSIS OF FACTORS AFFECTING THE IMPORT OF DAIRY MILK (CASE STUDY: THE IMPORT OF DAIRY MILK IN INDONESIA) RELIGIOUS BEHAVIOR OF AGRARIAN COMMUNITY IN LINGSAR VILLAGE, LOMBOK BARAT
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1