Alfin Ali Kadzafi, Moch. Khamim, M. Marjono
{"title":"PENYUSUNAN PROJECT PLANNING PEMBANGUNAN JALAN TOL BALIKPAPAN – SAMARINDA SEKSI 2.2","authors":"Alfin Ali Kadzafi, Moch. Khamim, M. Marjono","doi":"10.55404/jos-mrk.2021.02.03.195-201","DOIUrl":null,"url":null,"abstract":"Project of The Balikpapan – Samarinda Highway at The 2.2 Section which is carried out by PT. Wijaya Karya (Persero) Tbk. The 9 km long Balikpapan – Samarinda Highway needs an alternative project planning to succeed the project. The purpose of this thesis is (1) determine the implementation strategy, (2) to control the safety and quality, (3) to make the implementation schedule, (4) project implementation cost budget plan. The required data were detail engineering design (DED), work plan and provisions, base unit price Kab. Kutai Kartanegara in 2019. MS. Project 2019 was used for scheduling and MS. Excel 2019 was used for estimating the cost. From the results of project planning obtained: (1) strategy of carrying out earthworks, subgrade, aggregate foundation layers, work floors with division of 3 zones; rigid pavement work: done in sequence from Sta. 38 + 125 until Sta 47 + 125; Pile, Pile Cap and Abutment work: done alternately from Abutment 1 to Abutment 2; Erection Girder Work: Using Crawler Crane; bridge and Parapet floor plates: done simultaneously Abutment 1 and Abutment 2; Asphalt Work: done from bridge 1 to bridge 2. (2) quality plan which is indicated by SOP (standard operating procedure) and material testing plan in the field and HSE Plan by completing the HIRADC list to reduce the potential for work accidents in project implementation (3) on calendar days (4) at Rp. 411.266.751.000,00.","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"201 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.195-201","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

由PT. Wijaya Karya (Persero) Tbk执行的Balikpapan - Samarinda高速公路2.2段项目。九公里长的巴力巴潘-萨玛林达公路需要一个替代项目规划来接替该项目。本文的目的是:(1)确定实施策略;(2)对安全质量进行控制;(3)制定实施进度计划;(4)制定项目实施成本预算计划。所需数据为详细工程设计(DED)、工作计划和规定、基本单价Kab。Kutai Kartanegara, 2019年。ms Project 2019用于调度,ms Excel 2019用于估算成本。从工程规划结果中得出:(1)土方、路基、集料基础层、工作楼层划分三区的实施策略;刚性路面工程:从Sta. 38 + 125至Sta. 47 + 125依次完成;桩、承台及桥台工程:由桥台1至桥台2轮流进行;安装梁工程:履带式起重机桥、女儿墙底板:桥台1、桥台2同时做;沥青工程:从1号桥到2号桥。(2)通过完成HIRADC清单,制定SOP(标准作业程序)和现场材料测试计划以及HSE计划所指示的质量计划,以减少项目实施(3)在日历日(4)发生工作事故的可能性,Rp. 411.266.751.000,00。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
PENYUSUNAN PROJECT PLANNING PEMBANGUNAN JALAN TOL BALIKPAPAN – SAMARINDA SEKSI 2.2
Project of The Balikpapan – Samarinda Highway at The 2.2 Section which is carried out by PT. Wijaya Karya (Persero) Tbk. The 9 km long Balikpapan – Samarinda Highway needs an alternative project planning to succeed the project. The purpose of this thesis is (1) determine the implementation strategy, (2) to control the safety and quality, (3) to make the implementation schedule, (4) project implementation cost budget plan. The required data were detail engineering design (DED), work plan and provisions, base unit price Kab. Kutai Kartanegara in 2019. MS. Project 2019 was used for scheduling and MS. Excel 2019 was used for estimating the cost. From the results of project planning obtained: (1) strategy of carrying out earthworks, subgrade, aggregate foundation layers, work floors with division of 3 zones; rigid pavement work: done in sequence from Sta. 38 + 125 until Sta 47 + 125; Pile, Pile Cap and Abutment work: done alternately from Abutment 1 to Abutment 2; Erection Girder Work: Using Crawler Crane; bridge and Parapet floor plates: done simultaneously Abutment 1 and Abutment 2; Asphalt Work: done from bridge 1 to bridge 2. (2) quality plan which is indicated by SOP (standard operating procedure) and material testing plan in the field and HSE Plan by completing the HIRADC list to reduce the potential for work accidents in project implementation (3) on calendar days (4) at Rp. 411.266.751.000,00.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ANALISIS STABILITAS TUBUH BENDUNGAN PADA BENDUNGAN SEMANTOK KABUPATEN NGANJUK PROVINSI JAWA TIMUR ANALISA PERPANJANGAN LANDASAN PACU PADA BANDAR UDARA ABDULRACHMAN SALEH MALANG (STA 2+250 – STA 3+000) EVALUASI DAN PERENCANAAN ULANG SISTEM JARINGAN DRAINASE KECAMATAN KARTOHARJO KOTA MADIUN ANALISA KERUSAKAN JALAN MENGGUNAKAN METODE BINA MARGA PADA JALAN RAYA JERU – JALAN RAYA TUMPANG KABUPATEN MALANG PERENCANAAN ULANG STRUKTUR ATAS DAN RAB GEDUNG KULIAH AKN PUTRA SANG FAJAR
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1