综合炼钢场地废弃物减量化应用研究

J. Riesbeck, Kararina Lundkvist, Mats Bramming, Anita Wedholm
{"title":"综合炼钢场地废弃物减量化应用研究","authors":"J. Riesbeck, Kararina Lundkvist, Mats Bramming, Anita Wedholm","doi":"10.1109/WCST.2015.7414850","DOIUrl":null,"url":null,"abstract":"Recycling is of major interest in steel making for environmental reasons as well as economical. All process units produce secondary materials which are recycled, sold or put in landfill. This work evaluates simulated cases for recycling of materials at an integrated steel site. Case studies and industrial tests of different recycling options have been performed. The main focus has been on residues produced in significant quantities and materials put in landfill due to their physical or chemical nature. Chosen case studies have been tested in industrial scale and comprise of recycling of dust, sludge and ladle slag to the blast furnace. The results from test periods have been used to compare modelling with process parameters. Industrial tests show that it will be beneficial to recycle steel plant (BOF) sludge via briquettes to the blast furnace but the main issue is the drying of the sludge. Furthermore ladle slag can be used as slag former in the BF with no negative effect on the process or product. The main advantage is that the resource efficiency increases since less virgin material is used and the depositing of secondary materials is decreased. Major cost savings can be found if internal recirculation can replace raw material such as iron ore, coke and lime stone.","PeriodicalId":259036,"journal":{"name":"2015 World Congress on Sustainable Technologies (WCST)","volume":"89 2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Applied investigation on waste minimization in an integrated steel site\",\"authors\":\"J. Riesbeck, Kararina Lundkvist, Mats Bramming, Anita Wedholm\",\"doi\":\"10.1109/WCST.2015.7414850\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Recycling is of major interest in steel making for environmental reasons as well as economical. All process units produce secondary materials which are recycled, sold or put in landfill. This work evaluates simulated cases for recycling of materials at an integrated steel site. Case studies and industrial tests of different recycling options have been performed. The main focus has been on residues produced in significant quantities and materials put in landfill due to their physical or chemical nature. Chosen case studies have been tested in industrial scale and comprise of recycling of dust, sludge and ladle slag to the blast furnace. The results from test periods have been used to compare modelling with process parameters. Industrial tests show that it will be beneficial to recycle steel plant (BOF) sludge via briquettes to the blast furnace but the main issue is the drying of the sludge. Furthermore ladle slag can be used as slag former in the BF with no negative effect on the process or product. The main advantage is that the resource efficiency increases since less virgin material is used and the depositing of secondary materials is decreased. Major cost savings can be found if internal recirculation can replace raw material such as iron ore, coke and lime stone.\",\"PeriodicalId\":259036,\"journal\":{\"name\":\"2015 World Congress on Sustainable Technologies (WCST)\",\"volume\":\"89 2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 World Congress on Sustainable Technologies (WCST)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/WCST.2015.7414850\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 World Congress on Sustainable Technologies (WCST)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WCST.2015.7414850","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

由于环保和经济的原因,回收是炼钢的主要兴趣。所有处理单元生产的二次材料被回收、出售或填埋。本工作评估了综合钢铁现场材料回收的模拟案例。对不同的回收办法进行了个案研究和工业试验。主要关注的是大量产生的残留物和由于其物理或化学性质而被填埋的材料。选定的案例研究已经在工业规模上进行了测试,包括将粉尘、污泥和钢包渣回收到高炉。从测试周期的结果已用于比较建模与工艺参数。工业试验表明,将炼钢厂污泥经压块回用到高炉是有益的,但主要问题是污泥的干燥。此外,钢包渣可以在高炉中用作造渣剂,对工艺和产品没有负面影响。主要优点是资源效率提高,因为使用的原始材料较少,二次材料的沉积减少。如果内部再循环可以替代铁矿石、焦炭和石灰石等原材料,则可以节省大量成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Applied investigation on waste minimization in an integrated steel site
Recycling is of major interest in steel making for environmental reasons as well as economical. All process units produce secondary materials which are recycled, sold or put in landfill. This work evaluates simulated cases for recycling of materials at an integrated steel site. Case studies and industrial tests of different recycling options have been performed. The main focus has been on residues produced in significant quantities and materials put in landfill due to their physical or chemical nature. Chosen case studies have been tested in industrial scale and comprise of recycling of dust, sludge and ladle slag to the blast furnace. The results from test periods have been used to compare modelling with process parameters. Industrial tests show that it will be beneficial to recycle steel plant (BOF) sludge via briquettes to the blast furnace but the main issue is the drying of the sludge. Furthermore ladle slag can be used as slag former in the BF with no negative effect on the process or product. The main advantage is that the resource efficiency increases since less virgin material is used and the depositing of secondary materials is decreased. Major cost savings can be found if internal recirculation can replace raw material such as iron ore, coke and lime stone.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A low cost Functional Electrical Stimulation (FES) system for essential tremor suppression using off the shelf components Home composter: Domestic use composter Simulation techniques for an Efficient Use of Resources: An overview for the steelmaking field Resource efficiency in the Strategic Research Agenda of the European Steel Technology Platform Examining the implantation of sustainability into state procurement decision models: An experiential overview of the Nigerian public sector
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1