{"title":"智能电表辐射研究","authors":"Jin Bai, D. Zhang","doi":"10.1109/ISEMC.2012.6350916","DOIUrl":null,"url":null,"abstract":"This paper briefly introduces how and where SmartMeters are commonly installed, the FCC regulations on SmartMeters. The calculation of MPE is presented. The co-located SmartMeters installation and respective public concern are discussed.","PeriodicalId":197346,"journal":{"name":"2012 IEEE International Symposium on Electromagnetic Compatibility","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2012-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Study on the radiation from Smartmeters\",\"authors\":\"Jin Bai, D. Zhang\",\"doi\":\"10.1109/ISEMC.2012.6350916\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper briefly introduces how and where SmartMeters are commonly installed, the FCC regulations on SmartMeters. The calculation of MPE is presented. The co-located SmartMeters installation and respective public concern are discussed.\",\"PeriodicalId\":197346,\"journal\":{\"name\":\"2012 IEEE International Symposium on Electromagnetic Compatibility\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-11-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 IEEE International Symposium on Electromagnetic Compatibility\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISEMC.2012.6350916\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 IEEE International Symposium on Electromagnetic Compatibility","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISEMC.2012.6350916","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
This paper briefly introduces how and where SmartMeters are commonly installed, the FCC regulations on SmartMeters. The calculation of MPE is presented. The co-located SmartMeters installation and respective public concern are discussed.