{"title":"基于模糊的建设项目管理风险模型","authors":"Z. Chaher, H. Benseghir, A. Ibrahim, M. Kabir","doi":"10.1109/SPC.2018.8704159","DOIUrl":null,"url":null,"abstract":"Construction industry involves complex and challenging process associated with the risk of injury, death and property loss. Experts from different departments work together to develop a good management system in order to successfully complete a construction project. This paper presents a model of risk analysis using fuzzy logic to assess the risk involved in construction projects. The uncertainties related to cost, time and quality in the project is handled by the fuzzy logic that is one of the methods dealing with uncertainties in risk analysis. The model was validated using a real project. The test results demonstrated the plausibility of the model for the risk analysis in a real scenario. Using this model, one can prioritize and rank all risk factors in a construction project. Thus, the project managers and leaders can appropriately take precautions to avoid the risk. The proposed model of fuzzy-based risk analysis simplifies the risk management process, which helps the decision makers and the experts to monitor and to control the project, and ultimately, to meet the satisfaction of stakeholders.","PeriodicalId":432464,"journal":{"name":"2018 IEEE Conference on Systems, Process and Control (ICSPC)","volume":"181 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A Fuzzy-based Risk Model for Construction Project Management\",\"authors\":\"Z. Chaher, H. Benseghir, A. Ibrahim, M. Kabir\",\"doi\":\"10.1109/SPC.2018.8704159\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Construction industry involves complex and challenging process associated with the risk of injury, death and property loss. Experts from different departments work together to develop a good management system in order to successfully complete a construction project. This paper presents a model of risk analysis using fuzzy logic to assess the risk involved in construction projects. The uncertainties related to cost, time and quality in the project is handled by the fuzzy logic that is one of the methods dealing with uncertainties in risk analysis. The model was validated using a real project. The test results demonstrated the plausibility of the model for the risk analysis in a real scenario. Using this model, one can prioritize and rank all risk factors in a construction project. Thus, the project managers and leaders can appropriately take precautions to avoid the risk. The proposed model of fuzzy-based risk analysis simplifies the risk management process, which helps the decision makers and the experts to monitor and to control the project, and ultimately, to meet the satisfaction of stakeholders.\",\"PeriodicalId\":432464,\"journal\":{\"name\":\"2018 IEEE Conference on Systems, Process and Control (ICSPC)\",\"volume\":\"181 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE Conference on Systems, Process and Control (ICSPC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SPC.2018.8704159\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE Conference on Systems, Process and Control (ICSPC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SPC.2018.8704159","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

建筑行业涉及复杂和具有挑战性的过程,涉及伤害、死亡和财产损失的风险。来自不同部门的专家共同努力,制定一个良好的管理制度,以顺利完成一个建设项目。本文提出了一种应用模糊逻辑对建设项目风险进行评估的风险分析模型。模糊逻辑是风险分析中处理不确定性的方法之一,是对项目中成本、时间和质量的不确定性进行处理。该模型通过实际工程进行了验证。测试结果证明了该模型在实际场景中进行风险分析的合理性。使用这个模型,可以对建筑项目中的所有风险因素进行优先级排序。因此,项目经理和领导可以采取适当的预防措施来避免风险。提出的基于模糊的风险分析模型简化了风险管理过程,有助于决策者和专家对项目进行监视和控制,最终达到利益相关者的满意。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A Fuzzy-based Risk Model for Construction Project Management
Construction industry involves complex and challenging process associated with the risk of injury, death and property loss. Experts from different departments work together to develop a good management system in order to successfully complete a construction project. This paper presents a model of risk analysis using fuzzy logic to assess the risk involved in construction projects. The uncertainties related to cost, time and quality in the project is handled by the fuzzy logic that is one of the methods dealing with uncertainties in risk analysis. The model was validated using a real project. The test results demonstrated the plausibility of the model for the risk analysis in a real scenario. Using this model, one can prioritize and rank all risk factors in a construction project. Thus, the project managers and leaders can appropriately take precautions to avoid the risk. The proposed model of fuzzy-based risk analysis simplifies the risk management process, which helps the decision makers and the experts to monitor and to control the project, and ultimately, to meet the satisfaction of stakeholders.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The Effect of Foot Arch on Plantar Distribution During Running A Comparative Study of Valve Stiction Compensation: Knocker Based Methods Design and Implement SumoBot for Classroom Teaching Vibration Control of a Nonlinear Double-Pendulum Overhead Crane Using Feedforward Command Shaping Mother Wavelet Selection for Control Valve Leakage Detection using Acoustic Emission
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1