科威特定向井设计轨迹的验证

B. Biltayib, Sadeq Damrah, Bushrah Al-Fakeh, A. Alkanderi
{"title":"科威特定向井设计轨迹的验证","authors":"B. Biltayib, Sadeq Damrah, Bushrah Al-Fakeh, A. Alkanderi","doi":"10.1109/SMART.2015.7399230","DOIUrl":null,"url":null,"abstract":"From directional surveys, calculating the well courses can generate errors due to the uncertainty of the survey methods. These methods are analyzed and discussed in terms of which of these models approximates the real well course best, since all models yield different results with the same given survey data. This paper studies a real case of directional well design, which was obtained from Al-Kafji Joint Operation Company (KJOC) with the resulting data of the well path. Two common directional drilling survey methods are applied on the real case and the results have been compared and discussed.","PeriodicalId":365573,"journal":{"name":"2015 International Conference on Sustainable Mobility Applications, Renewables and Technology (SMART)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Validation of directional drilling well design trajectory with a case study in Kuwait\",\"authors\":\"B. Biltayib, Sadeq Damrah, Bushrah Al-Fakeh, A. Alkanderi\",\"doi\":\"10.1109/SMART.2015.7399230\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"From directional surveys, calculating the well courses can generate errors due to the uncertainty of the survey methods. These methods are analyzed and discussed in terms of which of these models approximates the real well course best, since all models yield different results with the same given survey data. This paper studies a real case of directional well design, which was obtained from Al-Kafji Joint Operation Company (KJOC) with the resulting data of the well path. Two common directional drilling survey methods are applied on the real case and the results have been compared and discussed.\",\"PeriodicalId\":365573,\"journal\":{\"name\":\"2015 International Conference on Sustainable Mobility Applications, Renewables and Technology (SMART)\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on Sustainable Mobility Applications, Renewables and Technology (SMART)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SMART.2015.7399230\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Sustainable Mobility Applications, Renewables and Technology (SMART)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SMART.2015.7399230","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在定向测量中,由于测量方法的不确定性,计算井眼会产生误差。由于所有模型在给定的相同调查数据下得出的结果不同,因此对这些方法进行了分析和讨论,以确定哪种模型最接近实际井程。本文研究了Al-Kafji联合作业公司(KJOC)的一个实际定向井设计案例,并给出了井眼轨迹数据。将两种常用的定向钻井测量方法应用于实际实例,并对测量结果进行了比较和讨论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Validation of directional drilling well design trajectory with a case study in Kuwait
From directional surveys, calculating the well courses can generate errors due to the uncertainty of the survey methods. These methods are analyzed and discussed in terms of which of these models approximates the real well course best, since all models yield different results with the same given survey data. This paper studies a real case of directional well design, which was obtained from Al-Kafji Joint Operation Company (KJOC) with the resulting data of the well path. Two common directional drilling survey methods are applied on the real case and the results have been compared and discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Influences of different heating strategies on the energy demand of an airfield luggage tug Vehicle concept design by using a fuel cell as range extender An improved parametrization method for Li-ion linear static Equivalent Circuit battery Models based on direct current resistance measurement A DC link switch-based common mode voltage reduction scheme in PWM inverter drives On the stator magnetic circuit design of tubular-linear PM synchronous machines: A comparison between three topologies
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1