{"title":"在支持bim的项目中管理合同风险","authors":"N. Mustaffa, Shaun Kok Zhen Xiong, M. Mustapa, Hamizah Liyana Tajul Ariffin, Fuziah Ismail","doi":"10.1063/5.0071177","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":183554,"journal":{"name":"CENTRAL EUROPEAN SYMPOSIUM ON THERMOPHYSICS 2021 (CEST 2021)","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Management of contractual risks in a BIM-enabled project\",\"authors\":\"N. Mustaffa, Shaun Kok Zhen Xiong, M. Mustapa, Hamizah Liyana Tajul Ariffin, Fuziah Ismail\",\"doi\":\"10.1063/5.0071177\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":183554,\"journal\":{\"name\":\"CENTRAL EUROPEAN SYMPOSIUM ON THERMOPHYSICS 2021 (CEST 2021)\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"CENTRAL EUROPEAN SYMPOSIUM ON THERMOPHYSICS 2021 (CEST 2021)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1063/5.0071177\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"CENTRAL EUROPEAN SYMPOSIUM ON THERMOPHYSICS 2021 (CEST 2021)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1063/5.0071177","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0