I. Sriwana, Amarilis Jatikusumo, Nofi Erni, Arief Suwandi, T. Rachman
{"title":"* Corresponding作家。Iphov Kumala Sriwana邮箱:iphovkumala@telmail@ac . XYZ的区间平衡建议id使用Moodie-Young和积极体重体重来提高产业率","authors":"I. Sriwana, Amarilis Jatikusumo, Nofi Erni, Arief Suwandi, T. Rachman","doi":"10.25170/metris.v22i02.2913","DOIUrl":null,"url":null,"abstract":"PT. XYZ is a company that produces X shoes. To meet customer needs, it is necessary to design an effective and efficient production line. The problem experienced by the company is that the production target has not been achieved, which is 80 pairs per hour. The daily output that is achieved is less than the predetermined production target, so it is necessary to analyze the line balance. The purpose of this analysis is to determine the causes of not achieving production targets, to determine the value of line efficiency, balanced delay, and smoothness index for each method and to get the right proposal for the company. The research was conducted by describing precedence diagrams and collecting time data from each work element then testing and calculating the standard time, following which line balancing was carried out using the Ranked Positional Weight and Moodie-young. From the calculation results, the results obtained a better line balance using the Moodie-young method, namely, an increase in line efficiency by 27.45% from 57.67% to 85.12%, a decrease in balanced delay by 25.09% from 39.97%. to 14.88%, and a decrease in the smoothness index of 39.55 from 62.62 to 23.08. In addition, there was a decrease in the number of operators working by 2 people, from 16 operators to 14 operators and a reduction in the existing work stations (SK) by 4 SK, from 12 SK to 8 SK.","PeriodicalId":402087,"journal":{"name":"Jurnal METRIS","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-02-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"*Corresponding author. Iphov Kumala Sriwana Email address: iphovkumala@telkomuniversity.ac.id Usulan Perbaikan Keseimbangan Lini di PT. XYZ Menggunakan Moodie-Young dan Ranked Positional Weight untuk Meningkatkan Efisiensi Lini Produksi\",\"authors\":\"I. Sriwana, Amarilis Jatikusumo, Nofi Erni, Arief Suwandi, T. Rachman\",\"doi\":\"10.25170/metris.v22i02.2913\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PT. XYZ is a company that produces X shoes. To meet customer needs, it is necessary to design an effective and efficient production line. The problem experienced by the company is that the production target has not been achieved, which is 80 pairs per hour. The daily output that is achieved is less than the predetermined production target, so it is necessary to analyze the line balance. The purpose of this analysis is to determine the causes of not achieving production targets, to determine the value of line efficiency, balanced delay, and smoothness index for each method and to get the right proposal for the company. The research was conducted by describing precedence diagrams and collecting time data from each work element then testing and calculating the standard time, following which line balancing was carried out using the Ranked Positional Weight and Moodie-young. From the calculation results, the results obtained a better line balance using the Moodie-young method, namely, an increase in line efficiency by 27.45% from 57.67% to 85.12%, a decrease in balanced delay by 25.09% from 39.97%. to 14.88%, and a decrease in the smoothness index of 39.55 from 62.62 to 23.08. In addition, there was a decrease in the number of operators working by 2 people, from 16 operators to 14 operators and a reduction in the existing work stations (SK) by 4 SK, from 12 SK to 8 SK.\",\"PeriodicalId\":402087,\"journal\":{\"name\":\"Jurnal METRIS\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-02-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal METRIS\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25170/metris.v22i02.2913\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal METRIS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25170/metris.v22i02.2913","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

PT. XYZ是一家生产X鞋的公司。为了满足客户的需求,有必要设计一条高效的生产线。公司遇到的问题是没有达到生产目标,也就是每小时80双。每天完成的产量低于预定的生产目标,因此有必要对生产线平衡进行分析。此分析的目的是确定未实现生产目标的原因,确定每种方法的线效率,平衡延迟和平滑度指标的值,并为公司提供正确的建议。研究通过描述优先级图和收集每个工作单元的时间数据,然后测试和计算标准时间,然后使用排名位置权重和穆迪-杨进行线平衡。从计算结果来看,采用modie -young方法获得了较好的线路平衡效果,线路效率由57.67%提高到85.12%,提高27.45%,平衡延迟由39.97%降低25.09%。平滑度指数为39.55,从62.62下降到23.08。此外,工作的操作员人数减少了2人,从16名操作员减少到14名操作员,现有工作站(SK)减少了4名,从12名操作员减少到8名操作员。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
*Corresponding author. Iphov Kumala Sriwana Email address: iphovkumala@telkomuniversity.ac.id Usulan Perbaikan Keseimbangan Lini di PT. XYZ Menggunakan Moodie-Young dan Ranked Positional Weight untuk Meningkatkan Efisiensi Lini Produksi
PT. XYZ is a company that produces X shoes. To meet customer needs, it is necessary to design an effective and efficient production line. The problem experienced by the company is that the production target has not been achieved, which is 80 pairs per hour. The daily output that is achieved is less than the predetermined production target, so it is necessary to analyze the line balance. The purpose of this analysis is to determine the causes of not achieving production targets, to determine the value of line efficiency, balanced delay, and smoothness index for each method and to get the right proposal for the company. The research was conducted by describing precedence diagrams and collecting time data from each work element then testing and calculating the standard time, following which line balancing was carried out using the Ranked Positional Weight and Moodie-young. From the calculation results, the results obtained a better line balance using the Moodie-young method, namely, an increase in line efficiency by 27.45% from 57.67% to 85.12%, a decrease in balanced delay by 25.09% from 39.97%. to 14.88%, and a decrease in the smoothness index of 39.55 from 62.62 to 23.08. In addition, there was a decrease in the number of operators working by 2 people, from 16 operators to 14 operators and a reduction in the existing work stations (SK) by 4 SK, from 12 SK to 8 SK.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Penerapan Rantai Markov Pada Pola Perpindahan Pembelian di Produk Songkok The Application of Sentiment Analysis on Customers Responses in Social Media (Case Study: Indihome and First Media Internet Service Provider) PENJADWALAN PERAWAT BERDASARKAN MINIMASI PELANGGARAN PERATURAN DAN MINIMASI BIAYA LEMBUR Natural Tourism Potential Assessment Model in Rembang Regency Analisis Peramalan Dengan Simulasi Monte Carlo dan Implementasi Pengendalian Persediaan Gula Berdasarkan EOQ
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1