{"title":"越南输电系统电压暂降的预测,以实例为例","authors":"B. Q. Khanh, N. H. Phuc","doi":"10.1109/PSCE.2011.5772581","DOIUrl":null,"url":null,"abstract":"In this paper, a novel effort for prediction of voltage sag in the entire transmission system of Vietnam is presented. As the Vietnamese electricity industry moves toward the electricity market, prediction will help utilities have early assessment of power quality in transmission system. The proposed prediction approach uses a fault position method in which the fault distribution in the transmission system is created based on an actual fault occurrence in the entire 220kV and 500kV transmission system throughout Vietnam that took place in 2008. The research also makes use of the SARFICURVE with ITIC and SEMI curve, which takes into account of the actual fault clearing time of protective devices used in transmission system in Vietnam. By using SARFICURVE, a better assessment of voltage sag performance is obtained in the transmission system with regard to load's voltage tolerance.","PeriodicalId":120665,"journal":{"name":"2011 IEEE/PES Power Systems Conference and Exposition","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-03-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Prediction of voltage sag in the transmission system of Vietnam, A case study\",\"authors\":\"B. Q. Khanh, N. H. Phuc\",\"doi\":\"10.1109/PSCE.2011.5772581\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, a novel effort for prediction of voltage sag in the entire transmission system of Vietnam is presented. As the Vietnamese electricity industry moves toward the electricity market, prediction will help utilities have early assessment of power quality in transmission system. The proposed prediction approach uses a fault position method in which the fault distribution in the transmission system is created based on an actual fault occurrence in the entire 220kV and 500kV transmission system throughout Vietnam that took place in 2008. The research also makes use of the SARFICURVE with ITIC and SEMI curve, which takes into account of the actual fault clearing time of protective devices used in transmission system in Vietnam. By using SARFICURVE, a better assessment of voltage sag performance is obtained in the transmission system with regard to load's voltage tolerance.\",\"PeriodicalId\":120665,\"journal\":{\"name\":\"2011 IEEE/PES Power Systems Conference and Exposition\",\"volume\":\"22 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-03-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 IEEE/PES Power Systems Conference and Exposition\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PSCE.2011.5772581\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE/PES Power Systems Conference and Exposition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PSCE.2011.5772581","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

本文提出了一种预测越南整个输电系统电压暂降的新方法。随着越南电力行业走向电力市场,预测将有助于电力公司对输电系统的电能质量进行早期评估。本文提出的预测方法采用故障定位法,根据2008年越南整个220kV和500kV输电系统实际发生的故障创建输电系统的故障分布。研究还利用了SARFICURVE的ITIC和SEMI曲线,考虑了越南输电系统中使用的保护装置的实际故障清除时间。通过SARFICURVE,可以从负载容限的角度更好地评估输电系统的电压暂降性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Prediction of voltage sag in the transmission system of Vietnam, A case study
In this paper, a novel effort for prediction of voltage sag in the entire transmission system of Vietnam is presented. As the Vietnamese electricity industry moves toward the electricity market, prediction will help utilities have early assessment of power quality in transmission system. The proposed prediction approach uses a fault position method in which the fault distribution in the transmission system is created based on an actual fault occurrence in the entire 220kV and 500kV transmission system throughout Vietnam that took place in 2008. The research also makes use of the SARFICURVE with ITIC and SEMI curve, which takes into account of the actual fault clearing time of protective devices used in transmission system in Vietnam. By using SARFICURVE, a better assessment of voltage sag performance is obtained in the transmission system with regard to load's voltage tolerance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Testing the “smarts” in the smart T & D grid Similarity measures in Small World Stratification for distribution fault diagnosis Market-based transmission expansion planning Customer-centered control system for intelligent and green building with heuristic optimization Concepts of FACTS controllers
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1