{"title":"电气化铁路带OPF和机组承诺的高压直流馈电","authors":"L. Abrahamsson, S. Ostlund, L. Soder","doi":"10.1109/ESARS.2012.6387481","DOIUrl":null,"url":null,"abstract":"In this paper a railway power system design based on an HVDC feeder is suggested. The converter stations between the public grid and the HVDC feeder can be sparsely distributed, in the range of 100 km or more, whereas the converters connecting the HVDC feeder to the catenary are distributed with a much closer spacing. The ratings of the catenary-connected ones can be lower than substation transformers or rotary converters, since the power conversion can be fully controlled. Simulations of the proposed solution show clear advantages regarding transmission losses and voltages compared to conventional systems, especially for cases with long catenary sections, and when there are substantial shares of regeneration from the trains.","PeriodicalId":243822,"journal":{"name":"2012 Electrical Systems for Aircraft, Railway and Ship Propulsion","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-12-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"HVDC feeding with OPF and unit commitment for electric railways\",\"authors\":\"L. Abrahamsson, S. Ostlund, L. Soder\",\"doi\":\"10.1109/ESARS.2012.6387481\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper a railway power system design based on an HVDC feeder is suggested. The converter stations between the public grid and the HVDC feeder can be sparsely distributed, in the range of 100 km or more, whereas the converters connecting the HVDC feeder to the catenary are distributed with a much closer spacing. The ratings of the catenary-connected ones can be lower than substation transformers or rotary converters, since the power conversion can be fully controlled. Simulations of the proposed solution show clear advantages regarding transmission losses and voltages compared to conventional systems, especially for cases with long catenary sections, and when there are substantial shares of regeneration from the trains.\",\"PeriodicalId\":243822,\"journal\":{\"name\":\"2012 Electrical Systems for Aircraft, Railway and Ship Propulsion\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-12-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 Electrical Systems for Aircraft, Railway and Ship Propulsion\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ESARS.2012.6387481\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 Electrical Systems for Aircraft, Railway and Ship Propulsion","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ESARS.2012.6387481","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
HVDC feeding with OPF and unit commitment for electric railways
In this paper a railway power system design based on an HVDC feeder is suggested. The converter stations between the public grid and the HVDC feeder can be sparsely distributed, in the range of 100 km or more, whereas the converters connecting the HVDC feeder to the catenary are distributed with a much closer spacing. The ratings of the catenary-connected ones can be lower than substation transformers or rotary converters, since the power conversion can be fully controlled. Simulations of the proposed solution show clear advantages regarding transmission losses and voltages compared to conventional systems, especially for cases with long catenary sections, and when there are substantial shares of regeneration from the trains.