{"title":"基于质量信息集成的计算机信息系统集成项目管理算法研究","authors":"Hui Pan","doi":"10.1109/ICISCAE52414.2021.9590806","DOIUrl":null,"url":null,"abstract":"Information system integration project management has many functions that project management does not have, and its content is much richer than project management. Computer System (CIS) project management is a kind of systematic project management that analyzes and manages the cost, personnel, quality inspection, risks and progress, so that the project can carry out related activities according to the budgeted cost, progress and quality. With the continuous improvement of science and technology and productivity, quality management is also making continuous progress. Based on this, this paper puts forward a computer information system integration project management algorithm based on quality information integration, which combines the project management theory with the project practice of BMS company, thus shortening the project cycle, reducing the project cost, ensuring the project quality and creating maximum value and benefit for BMS company. In order to improve the comprehensive efficiency of project implementation, it is necessary to formulate a highly operable and reasonable work plan according to the specific characteristics of the project, and scientifically prepare and optimize various elements.","PeriodicalId":115061,"journal":{"name":"International Conference on Information Systems and Computer Aided Education","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Project Management Algorithm of Computer Information System Integration Based on Quality Information Integration\",\"authors\":\"Hui Pan\",\"doi\":\"10.1109/ICISCAE52414.2021.9590806\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Information system integration project management has many functions that project management does not have, and its content is much richer than project management. Computer System (CIS) project management is a kind of systematic project management that analyzes and manages the cost, personnel, quality inspection, risks and progress, so that the project can carry out related activities according to the budgeted cost, progress and quality. With the continuous improvement of science and technology and productivity, quality management is also making continuous progress. Based on this, this paper puts forward a computer information system integration project management algorithm based on quality information integration, which combines the project management theory with the project practice of BMS company, thus shortening the project cycle, reducing the project cost, ensuring the project quality and creating maximum value and benefit for BMS company. In order to improve the comprehensive efficiency of project implementation, it is necessary to formulate a highly operable and reasonable work plan according to the specific characteristics of the project, and scientifically prepare and optimize various elements.\",\"PeriodicalId\":115061,\"journal\":{\"name\":\"International Conference on Information Systems and Computer Aided Education\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Conference on Information Systems and Computer Aided Education\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICISCAE52414.2021.9590806\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Conference on Information Systems and Computer Aided Education","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICISCAE52414.2021.9590806","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Research on Project Management Algorithm of Computer Information System Integration Based on Quality Information Integration
Information system integration project management has many functions that project management does not have, and its content is much richer than project management. Computer System (CIS) project management is a kind of systematic project management that analyzes and manages the cost, personnel, quality inspection, risks and progress, so that the project can carry out related activities according to the budgeted cost, progress and quality. With the continuous improvement of science and technology and productivity, quality management is also making continuous progress. Based on this, this paper puts forward a computer information system integration project management algorithm based on quality information integration, which combines the project management theory with the project practice of BMS company, thus shortening the project cycle, reducing the project cost, ensuring the project quality and creating maximum value and benefit for BMS company. In order to improve the comprehensive efficiency of project implementation, it is necessary to formulate a highly operable and reasonable work plan according to the specific characteristics of the project, and scientifically prepare and optimize various elements.