{"title":"光伏技术建筑应用试验要求研究","authors":"Yu-jin Lee, HunSeung Noh, D. Shin","doi":"10.7836/kses.2022.42.1.141","DOIUrl":null,"url":null,"abstract":"Because photovoltaic technology applied to the building is intended for long-term use, it is important to undergoes sufficient test before installation. In general, testing of photovoltaic technology is mainly performed on the components of the system. However, because each component is combined with the building’s applied solar technology, various tests are required in its combined state with the building. Therefore, in this study, the current status of photovoltaic technology, procedures, and related facilities were investigated to derive the requirements of the building application test for photovoltaic technology. Based on the results of the investigation, test requirements were derived, such as content to be considered when testing building-applied photovoltaic technology and facility requirements for testing and certification.","PeriodicalId":276437,"journal":{"name":"Journal of the Korean Solar Energy Society","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Study on Requirements for Building Application Test of Photovoltaic Technology\",\"authors\":\"Yu-jin Lee, HunSeung Noh, D. Shin\",\"doi\":\"10.7836/kses.2022.42.1.141\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Because photovoltaic technology applied to the building is intended for long-term use, it is important to undergoes sufficient test before installation. In general, testing of photovoltaic technology is mainly performed on the components of the system. However, because each component is combined with the building’s applied solar technology, various tests are required in its combined state with the building. Therefore, in this study, the current status of photovoltaic technology, procedures, and related facilities were investigated to derive the requirements of the building application test for photovoltaic technology. Based on the results of the investigation, test requirements were derived, such as content to be considered when testing building-applied photovoltaic technology and facility requirements for testing and certification.\",\"PeriodicalId\":276437,\"journal\":{\"name\":\"Journal of the Korean Solar Energy Society\",\"volume\":\"34 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-02-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the Korean Solar Energy Society\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.7836/kses.2022.42.1.141\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Korean Solar Energy Society","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7836/kses.2022.42.1.141","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A Study on Requirements for Building Application Test of Photovoltaic Technology
Because photovoltaic technology applied to the building is intended for long-term use, it is important to undergoes sufficient test before installation. In general, testing of photovoltaic technology is mainly performed on the components of the system. However, because each component is combined with the building’s applied solar technology, various tests are required in its combined state with the building. Therefore, in this study, the current status of photovoltaic technology, procedures, and related facilities were investigated to derive the requirements of the building application test for photovoltaic technology. Based on the results of the investigation, test requirements were derived, such as content to be considered when testing building-applied photovoltaic technology and facility requirements for testing and certification.