Guillaume Sasseville, Pascal Turcotte, V. Falmagne
{"title":"深部地震活动矿井LaRonde的地震风险管理控制措施","authors":"Guillaume Sasseville, Pascal Turcotte, V. Falmagne","doi":"10.56952/arma-2022-0625","DOIUrl":null,"url":null,"abstract":"The LaRonde mine is a world-class deposit of gold-copper and zinc-silver along the Cadillac Fault in the Abitibi-Témiscamingue region of Quebec, Canada. Since its inauguration in 1988, the LaRonde mine has produced over 7 M ounces of gold. Mining operations currently extend 3.2 km below the surface with plans to reach 3.4 km. The LaRonde mine has been dealing with induced seismicity daily since 2003. The seismic activity can exceed MRichter 2, and the pro-active management of seismic risk is a key element to operate this mine at that depth and under these seismically active conditions.Seismic risk at the LaRonde mine is currently managed through a combination of control measures, including a ground-control-driven mining sequence and level design, dynamic ground support systems, and procedures to limit workforce exposure. These control measures have evolved over time and been adapted to the seismic risk as the operation becomes deeper and larger. The main objective is to maintain a safe work environment while meeting production requirements.Seismic risk management is an ongoing concern at the LaRonde mine. This paper presents the current state of the strategic and tactical control measures implemented on site to manage seismic risk at the LaRonde mine, and it documents some of the impacts on operational flexibility and performance. The effectiveness of control measures must be quantified to measure improvements year after year and to identify and correct observed deficiencies.","PeriodicalId":418045,"journal":{"name":"Proceedings 56th US Rock Mechanics / Geomechanics Symposium","volume":"68 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Control Measures to Manage Seismic Risk at the LaRonde Mine, a Deep and Seismically Active Operation\",\"authors\":\"Guillaume Sasseville, Pascal Turcotte, V. Falmagne\",\"doi\":\"10.56952/arma-2022-0625\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The LaRonde mine is a world-class deposit of gold-copper and zinc-silver along the Cadillac Fault in the Abitibi-Témiscamingue region of Quebec, Canada. Since its inauguration in 1988, the LaRonde mine has produced over 7 M ounces of gold. Mining operations currently extend 3.2 km below the surface with plans to reach 3.4 km. The LaRonde mine has been dealing with induced seismicity daily since 2003. The seismic activity can exceed MRichter 2, and the pro-active management of seismic risk is a key element to operate this mine at that depth and under these seismically active conditions.Seismic risk at the LaRonde mine is currently managed through a combination of control measures, including a ground-control-driven mining sequence and level design, dynamic ground support systems, and procedures to limit workforce exposure. These control measures have evolved over time and been adapted to the seismic risk as the operation becomes deeper and larger. The main objective is to maintain a safe work environment while meeting production requirements.Seismic risk management is an ongoing concern at the LaRonde mine. This paper presents the current state of the strategic and tactical control measures implemented on site to manage seismic risk at the LaRonde mine, and it documents some of the impacts on operational flexibility and performance. The effectiveness of control measures must be quantified to measure improvements year after year and to identify and correct observed deficiencies.\",\"PeriodicalId\":418045,\"journal\":{\"name\":\"Proceedings 56th US Rock Mechanics / Geomechanics Symposium\",\"volume\":\"68 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings 56th US Rock Mechanics / Geomechanics Symposium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.56952/arma-2022-0625\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings 56th US Rock Mechanics / Geomechanics Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56952/arma-2022-0625","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Control Measures to Manage Seismic Risk at the LaRonde Mine, a Deep and Seismically Active Operation
The LaRonde mine is a world-class deposit of gold-copper and zinc-silver along the Cadillac Fault in the Abitibi-Témiscamingue region of Quebec, Canada. Since its inauguration in 1988, the LaRonde mine has produced over 7 M ounces of gold. Mining operations currently extend 3.2 km below the surface with plans to reach 3.4 km. The LaRonde mine has been dealing with induced seismicity daily since 2003. The seismic activity can exceed MRichter 2, and the pro-active management of seismic risk is a key element to operate this mine at that depth and under these seismically active conditions.Seismic risk at the LaRonde mine is currently managed through a combination of control measures, including a ground-control-driven mining sequence and level design, dynamic ground support systems, and procedures to limit workforce exposure. These control measures have evolved over time and been adapted to the seismic risk as the operation becomes deeper and larger. The main objective is to maintain a safe work environment while meeting production requirements.Seismic risk management is an ongoing concern at the LaRonde mine. This paper presents the current state of the strategic and tactical control measures implemented on site to manage seismic risk at the LaRonde mine, and it documents some of the impacts on operational flexibility and performance. The effectiveness of control measures must be quantified to measure improvements year after year and to identify and correct observed deficiencies.