大型工业电力系统工业目标优化设计与构建的计算机算法

M. Frigura-Iliasa, Mirela Iorga, L. Dolga, H. Filipescu
{"title":"大型工业电力系统工业目标优化设计与构建的计算机算法","authors":"M. Frigura-Iliasa, Mirela Iorga, L. Dolga, H. Filipescu","doi":"10.1109/SAMI.2019.8782732","DOIUrl":null,"url":null,"abstract":"This paper presents a simple algorithm, forwarded by an adequate software, performed in order to obtain an optimisation of the engineering graph developed for a real 400 kV Over Head Power Line, located in the West Region of Romania. The Critical Path of the whole construction sequence was determined by using the Ford Algorithm. We obtained a more accurate operation overview for all major phases on the construction site, by emphasizing the time relations between all these phases/operations. The newly applied software could be useful for other engineering applications, in all domains.","PeriodicalId":240256,"journal":{"name":"2019 IEEE 17th World Symposium on Applied Machine Intelligence and Informatics (SAMI)","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Computer Based Algorithm for Optimizing Design and Construction of Large Industrial Power System Industrial Objectives\",\"authors\":\"M. Frigura-Iliasa, Mirela Iorga, L. Dolga, H. Filipescu\",\"doi\":\"10.1109/SAMI.2019.8782732\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a simple algorithm, forwarded by an adequate software, performed in order to obtain an optimisation of the engineering graph developed for a real 400 kV Over Head Power Line, located in the West Region of Romania. The Critical Path of the whole construction sequence was determined by using the Ford Algorithm. We obtained a more accurate operation overview for all major phases on the construction site, by emphasizing the time relations between all these phases/operations. The newly applied software could be useful for other engineering applications, in all domains.\",\"PeriodicalId\":240256,\"journal\":{\"name\":\"2019 IEEE 17th World Symposium on Applied Machine Intelligence and Informatics (SAMI)\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 IEEE 17th World Symposium on Applied Machine Intelligence and Informatics (SAMI)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SAMI.2019.8782732\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE 17th World Symposium on Applied Machine Intelligence and Informatics (SAMI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SAMI.2019.8782732","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文提出了一个简单的算法,由一个适当的软件转发,以获得工程图的优化,为一个实际的400千伏架空电力线,位于罗马尼亚西部地区。采用Ford算法确定了整个施工序列的关键路径。通过强调所有阶段/操作之间的时间关系,我们获得了施工现场所有主要阶段的更准确的操作概况。新应用的软件可用于所有领域的其他工程应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Computer Based Algorithm for Optimizing Design and Construction of Large Industrial Power System Industrial Objectives
This paper presents a simple algorithm, forwarded by an adequate software, performed in order to obtain an optimisation of the engineering graph developed for a real 400 kV Over Head Power Line, located in the West Region of Romania. The Critical Path of the whole construction sequence was determined by using the Ford Algorithm. We obtained a more accurate operation overview for all major phases on the construction site, by emphasizing the time relations between all these phases/operations. The newly applied software could be useful for other engineering applications, in all domains.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Navigation Based on Fuzzy Cognitive Maps for Needs of Ubiquitous Robotics WiFi vulnerability caused by SSID forgery in the IEEE 802.11 protocol Optimizing the use of renewable energy sources in the energy mix of Hungary Laboratory in Cloud for Model Systems of System Based Engineering Structures FEM analysis of natural frequencies of jet engine iSTC-21v turbine blade
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1