{"title":"大型工业电力系统工业目标优化设计与构建的计算机算法","authors":"M. Frigura-Iliasa, Mirela Iorga, L. Dolga, H. Filipescu","doi":"10.1109/SAMI.2019.8782732","DOIUrl":null,"url":null,"abstract":"This paper presents a simple algorithm, forwarded by an adequate software, performed in order to obtain an optimisation of the engineering graph developed for a real 400 kV Over Head Power Line, located in the West Region of Romania. The Critical Path of the whole construction sequence was determined by using the Ford Algorithm. We obtained a more accurate operation overview for all major phases on the construction site, by emphasizing the time relations between all these phases/operations. The newly applied software could be useful for other engineering applications, in all domains.","PeriodicalId":240256,"journal":{"name":"2019 IEEE 17th World Symposium on Applied Machine Intelligence and Informatics (SAMI)","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Computer Based Algorithm for Optimizing Design and Construction of Large Industrial Power System Industrial Objectives\",\"authors\":\"M. Frigura-Iliasa, Mirela Iorga, L. Dolga, H. Filipescu\",\"doi\":\"10.1109/SAMI.2019.8782732\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a simple algorithm, forwarded by an adequate software, performed in order to obtain an optimisation of the engineering graph developed for a real 400 kV Over Head Power Line, located in the West Region of Romania. The Critical Path of the whole construction sequence was determined by using the Ford Algorithm. We obtained a more accurate operation overview for all major phases on the construction site, by emphasizing the time relations between all these phases/operations. The newly applied software could be useful for other engineering applications, in all domains.\",\"PeriodicalId\":240256,\"journal\":{\"name\":\"2019 IEEE 17th World Symposium on Applied Machine Intelligence and Informatics (SAMI)\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 IEEE 17th World Symposium on Applied Machine Intelligence and Informatics (SAMI)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SAMI.2019.8782732\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE 17th World Symposium on Applied Machine Intelligence and Informatics (SAMI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SAMI.2019.8782732","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Computer Based Algorithm for Optimizing Design and Construction of Large Industrial Power System Industrial Objectives
This paper presents a simple algorithm, forwarded by an adequate software, performed in order to obtain an optimisation of the engineering graph developed for a real 400 kV Over Head Power Line, located in the West Region of Romania. The Critical Path of the whole construction sequence was determined by using the Ford Algorithm. We obtained a more accurate operation overview for all major phases on the construction site, by emphasizing the time relations between all these phases/operations. The newly applied software could be useful for other engineering applications, in all domains.