列车运行稳定系数对铁路线运力的影响(Kroya-Kutoarjo-Yogyakarta)印度尼西亚

Yuwono Wiarco, S. Malkhamah, I. Muthohar, Luzile Mae Satur
{"title":"列车运行稳定系数对铁路线运力的影响(Kroya-Kutoarjo-Yogyakarta)印度尼西亚","authors":"Yuwono Wiarco, S. Malkhamah, I. Muthohar, Luzile Mae Satur","doi":"10.37367/jrtt.v1i2.11","DOIUrl":null,"url":null,"abstract":"Transportation is the backbone of development. It determines the economic growth of a country. Among any modes of transportation, railway is in need to be developed especially in the increasing of railway lines capacity in addition to the development of railway infrastructures, facilities, and the enhancement of rail operational. The determinant in rail operational is the stability in its operation. This stability can be seen by the punctuality of train arrival and departure, which is in accordance with the Graph Train Journey (Gapeka) and “delay” as the indicator. The study was conducted to determine the stability of railway operation and the delay of train travel as well as to identify the effect of the stability of railway operations to the capacity value of railway line. The study was conducted by collecting secondary data and conducting primary survey followed by data analysis. The results showed that the stability of rail operation for Kroya – Kutoarjo - Yogyakarta line was still low with an average delay of 15.60 minutes for double track and 21.68 minutes for single track. There was a decline in capacity when it was compared to the planned capacity or factual practical capacity at 22% on single track and 17% on double track. Further research on how to determine the cause of the instability of railway operation as input for the stability improvement would be needed in addition to the model or formulation to calculate line capacity in corresponding to the conditions in Indonesia.","PeriodicalId":268981,"journal":{"name":"Journal of Railway Transportation and Technology","volume":"240 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Impact of Stability Factor of Train Operations to Railway Line Capacity (Kroya-Kutoarjo-Yogyakarta) Indonesia\",\"authors\":\"Yuwono Wiarco, S. Malkhamah, I. Muthohar, Luzile Mae Satur\",\"doi\":\"10.37367/jrtt.v1i2.11\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Transportation is the backbone of development. It determines the economic growth of a country. Among any modes of transportation, railway is in need to be developed especially in the increasing of railway lines capacity in addition to the development of railway infrastructures, facilities, and the enhancement of rail operational. The determinant in rail operational is the stability in its operation. This stability can be seen by the punctuality of train arrival and departure, which is in accordance with the Graph Train Journey (Gapeka) and “delay” as the indicator. The study was conducted to determine the stability of railway operation and the delay of train travel as well as to identify the effect of the stability of railway operations to the capacity value of railway line. The study was conducted by collecting secondary data and conducting primary survey followed by data analysis. The results showed that the stability of rail operation for Kroya – Kutoarjo - Yogyakarta line was still low with an average delay of 15.60 minutes for double track and 21.68 minutes for single track. There was a decline in capacity when it was compared to the planned capacity or factual practical capacity at 22% on single track and 17% on double track. Further research on how to determine the cause of the instability of railway operation as input for the stability improvement would be needed in addition to the model or formulation to calculate line capacity in corresponding to the conditions in Indonesia.\",\"PeriodicalId\":268981,\"journal\":{\"name\":\"Journal of Railway Transportation and Technology\",\"volume\":\"240 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Railway Transportation and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37367/jrtt.v1i2.11\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Railway Transportation and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37367/jrtt.v1i2.11","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

交通运输是发展的支柱。它决定了一个国家的经济增长。在所有的运输方式中,铁路是需要发展的,特别是在铁路基础设施的发展和铁路业务的加强之外,还需要增加铁路的运力。铁路运行的决定因素是其运行的稳定性。这种稳定性可以从列车到达和离开的准点率上看出,这与火车旅程图(Gapeka)和“延迟”作为指标是一致的。研究确定铁路运营的稳定性和列车运行的延误,以及确定铁路运营的稳定性对铁路线路容量值的影响。本研究是通过收集二手资料,进行初步调查,然后进行数据分析。结果表明,克罗亚-库托若依-日惹线列车运行的稳定性仍然较低,双线列车平均延误15.60分钟,单线列车平均延误21.68分钟。与计划运力或实际运力相比,单轨列车运力下降22%,双轨列车运力下降17%。如何确定铁路运营不稳定的原因,作为提高稳定性的输入,除了计算线路容量的模型或公式,还需要根据印尼的情况进一步研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Impact of Stability Factor of Train Operations to Railway Line Capacity (Kroya-Kutoarjo-Yogyakarta) Indonesia
Transportation is the backbone of development. It determines the economic growth of a country. Among any modes of transportation, railway is in need to be developed especially in the increasing of railway lines capacity in addition to the development of railway infrastructures, facilities, and the enhancement of rail operational. The determinant in rail operational is the stability in its operation. This stability can be seen by the punctuality of train arrival and departure, which is in accordance with the Graph Train Journey (Gapeka) and “delay” as the indicator. The study was conducted to determine the stability of railway operation and the delay of train travel as well as to identify the effect of the stability of railway operations to the capacity value of railway line. The study was conducted by collecting secondary data and conducting primary survey followed by data analysis. The results showed that the stability of rail operation for Kroya – Kutoarjo - Yogyakarta line was still low with an average delay of 15.60 minutes for double track and 21.68 minutes for single track. There was a decline in capacity when it was compared to the planned capacity or factual practical capacity at 22% on single track and 17% on double track. Further research on how to determine the cause of the instability of railway operation as input for the stability improvement would be needed in addition to the model or formulation to calculate line capacity in corresponding to the conditions in Indonesia.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Evaluation of Facility Services at Kepatang Train Station Based on User and Community Interest Geometry Design of Railway Track for High-Speed Railways Bandung-Cirebon KM 00+000 - KM 33+850 Axle Counter Grounding System on The PPI Madiun Railway Using the Wenner Method Landslide Susceptibility Assessment of a Railway Based on GIS Application Study on Mechanical Properties of Pineapple Leaf-Glass Fiber Hybrid Composites for Car Body Applications
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1