墨西哥炼油厂升级电力系统的虚拟模型,2011年在招标过程中应用,2013年整合

L. Ruiz, F. Chavez, G. Rojas, E. Sosa
{"title":"墨西哥炼油厂升级电力系统的虚拟模型,2011年在招标过程中应用,2013年整合","authors":"L. Ruiz, F. Chavez, G. Rojas, E. Sosa","doi":"10.1109/IAS.2011.6074428","DOIUrl":null,"url":null,"abstract":"That paper shows a proposal to visualize in a fast way the tentative design of an electric upgrading in a Northern Mexican refinery, and the places where the primary electrical equipment are installed, which are described in tender bases specifications, generated in electrical upgrading projects, regarded in National Refining Industry (NRI). This paper shows a requirements analysis, software alternatives and its evaluation for the development of virtual paths. The virtual models where developed with a 3D design. Those models will improve time during work in field and meeting for clarifications, that are the first stages of aproachment between suppliers which sell the electrical equipment and NRI in the tender process by 2011 and starting up by 2013.","PeriodicalId":268988,"journal":{"name":"2011 IEEE Industry Applications Society Annual Meeting","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2011-11-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Virtual models for the upgrading electric system in Mexican refineries, application in the tender process by 2011 and integration by 2013\",\"authors\":\"L. Ruiz, F. Chavez, G. Rojas, E. Sosa\",\"doi\":\"10.1109/IAS.2011.6074428\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"That paper shows a proposal to visualize in a fast way the tentative design of an electric upgrading in a Northern Mexican refinery, and the places where the primary electrical equipment are installed, which are described in tender bases specifications, generated in electrical upgrading projects, regarded in National Refining Industry (NRI). This paper shows a requirements analysis, software alternatives and its evaluation for the development of virtual paths. The virtual models where developed with a 3D design. Those models will improve time during work in field and meeting for clarifications, that are the first stages of aproachment between suppliers which sell the electrical equipment and NRI in the tender process by 2011 and starting up by 2013.\",\"PeriodicalId\":268988,\"journal\":{\"name\":\"2011 IEEE Industry Applications Society Annual Meeting\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-11-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 IEEE Industry Applications Society Annual Meeting\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IAS.2011.6074428\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE Industry Applications Society Annual Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAS.2011.6074428","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

该论文提出了一项建议,以一种快速的方式可视化墨西哥北部炼油厂电力升级的初步设计,以及在国家炼油工业(NRI)考虑的电气升级项目中产生的招标基础规范中描述的初级电气设备安装位置。本文给出了虚拟路径开发的需求分析、软件选择及其评价。虚拟模型是用3D设计开发的。这些模型将缩短现场工作和澄清会议的时间,这是销售电气设备的供应商与NRI在2011年招标过程中接触的第一阶段,并在2013年开始。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Virtual models for the upgrading electric system in Mexican refineries, application in the tender process by 2011 and integration by 2013
That paper shows a proposal to visualize in a fast way the tentative design of an electric upgrading in a Northern Mexican refinery, and the places where the primary electrical equipment are installed, which are described in tender bases specifications, generated in electrical upgrading projects, regarded in National Refining Industry (NRI). This paper shows a requirements analysis, software alternatives and its evaluation for the development of virtual paths. The virtual models where developed with a 3D design. Those models will improve time during work in field and meeting for clarifications, that are the first stages of aproachment between suppliers which sell the electrical equipment and NRI in the tender process by 2011 and starting up by 2013.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Multi-rates fuel cell emulation with spatial reduced real-time fuel cell modelling Distribution of electric potential at the surface of corona-charged non-woven fabrics A sensorless induction motor drive using a least mean square speed estimator and the matrix converter Connectivity of DC microgrids involving sustainable energy sources A microprocessor-based controller for high temperature PEM fuel cells
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1