{"title":"可靠性中心维护在预防性维护计划中的应用软件方案设计","authors":"David Lazecký, V. Král, S. Rusek, R. Goňo","doi":"10.1109/EPE.2017.7967354","DOIUrl":null,"url":null,"abstract":"The implementation of Reliability Centered Maintenance into Preventive Maintenance Plan scheduling is one of the possible paths towards cost reductions in the fields of diagnostics and operating personnel. There is also the assumption of maintaining acceptable reliability of individual devices within the entire network. The devices to be considered suitable for application of RCM concern network elements present in sufficient quantities, supported with enough experience relevant to maintenance and with the data obtained through operative measurements and protection available. This data set forms ideal fundamentals for analysis and status assessment of a particular device. Provided the current status of a system element is known and it future development can be expected, the maintenance interval can be adjusted — giving priority to PMP applicable to devices in unsatisfactory condition and postponement of PMP for devices in good condition. This paper describes the design of software for PMP priority assessment pursuant to the RCM method with respect to priority assigned to electric power supply and evaluation of consequences for customers.","PeriodicalId":201464,"journal":{"name":"2017 18th International Scientific Conference on Electric Power Engineering (EPE)","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Software solution design for application of reliability centered maintenance in preventive maintenance plan\",\"authors\":\"David Lazecký, V. Král, S. Rusek, R. Goňo\",\"doi\":\"10.1109/EPE.2017.7967354\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The implementation of Reliability Centered Maintenance into Preventive Maintenance Plan scheduling is one of the possible paths towards cost reductions in the fields of diagnostics and operating personnel. There is also the assumption of maintaining acceptable reliability of individual devices within the entire network. The devices to be considered suitable for application of RCM concern network elements present in sufficient quantities, supported with enough experience relevant to maintenance and with the data obtained through operative measurements and protection available. This data set forms ideal fundamentals for analysis and status assessment of a particular device. Provided the current status of a system element is known and it future development can be expected, the maintenance interval can be adjusted — giving priority to PMP applicable to devices in unsatisfactory condition and postponement of PMP for devices in good condition. This paper describes the design of software for PMP priority assessment pursuant to the RCM method with respect to priority assigned to electric power supply and evaluation of consequences for customers.\",\"PeriodicalId\":201464,\"journal\":{\"name\":\"2017 18th International Scientific Conference on Electric Power Engineering (EPE)\",\"volume\":\"11 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 18th International Scientific Conference on Electric Power Engineering (EPE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPE.2017.7967354\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 18th International Scientific Conference on Electric Power Engineering (EPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPE.2017.7967354","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

在预防性维护计划调度中实施以可靠性为中心的维护是降低诊断和操作人员成本的可能途径之一。还有一个假设是在整个网络中保持单个设备的可接受可靠性。被认为适合RCM应用的设备涉及数量充足的网络元件,具有足够的维护经验,以及通过操作测量和可用保护获得的数据。这个数据集形成了一个特定设备的分析和状态评估的理想基础。如果已知系统元件的当前状态,并且可以预期未来的发展,则可以调整维护间隔-对状态不理想的设备优先进行PMP,对状态良好的设备推迟PMP。本文介绍了基于RCM方法的PMP优先级评估软件的设计,包括电力优先级分配和客户后果评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Software solution design for application of reliability centered maintenance in preventive maintenance plan
The implementation of Reliability Centered Maintenance into Preventive Maintenance Plan scheduling is one of the possible paths towards cost reductions in the fields of diagnostics and operating personnel. There is also the assumption of maintaining acceptable reliability of individual devices within the entire network. The devices to be considered suitable for application of RCM concern network elements present in sufficient quantities, supported with enough experience relevant to maintenance and with the data obtained through operative measurements and protection available. This data set forms ideal fundamentals for analysis and status assessment of a particular device. Provided the current status of a system element is known and it future development can be expected, the maintenance interval can be adjusted — giving priority to PMP applicable to devices in unsatisfactory condition and postponement of PMP for devices in good condition. This paper describes the design of software for PMP priority assessment pursuant to the RCM method with respect to priority assigned to electric power supply and evaluation of consequences for customers.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Overview of different concepts of traction drives with regard to high-speed PMSM Under frequency load shedding threats in island operation AC and DC response of heterojunction a-SiC/c-Si for PV application Features of controlled switching under normal and emergency operating conditions in medium voltage networks CFD-based evaluation of current-carrying capacity of power cables installed in free air
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1