{"title":"利用高压直流并联交流传统系统的可再生能源整合:亚得里亚海项目","authors":"M. Migliori, S. Lauria, L. Michi, G. Donnini, B. Aluisio, C. Vergine","doi":"10.1109/AEIT-HVDC.2019.8740556","DOIUrl":null,"url":null,"abstract":"Along the Adriatic coast, the Italian transmission system consists of a single 400 kV North-South Line. This limits the power transfer capacity between the Center North and Center South market zones and with the risk of overload in case of high renewable generation in Southern Italy. The year 2019 Network Development Plan foresaw the installation of a submarine High Voltage Direct Current (HVDC) line between the Fano (Center North) and Villanova (Center South) substations, in order to overcome environmental and social constrains and allow a full integration of Southern renewable sources. This paper presents an evaluation of the operating limits of a specific portion of the Adriatic 400 kV backbone, both in its current configuration and after the installation of the new HVDC link.","PeriodicalId":186931,"journal":{"name":"2019 AEIT HVDC International Conference (AEIT HVDC)","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Renewable sources integration using HVDC in parallel to AC traditional system: the Adriatic project\",\"authors\":\"M. Migliori, S. Lauria, L. Michi, G. Donnini, B. Aluisio, C. Vergine\",\"doi\":\"10.1109/AEIT-HVDC.2019.8740556\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Along the Adriatic coast, the Italian transmission system consists of a single 400 kV North-South Line. This limits the power transfer capacity between the Center North and Center South market zones and with the risk of overload in case of high renewable generation in Southern Italy. The year 2019 Network Development Plan foresaw the installation of a submarine High Voltage Direct Current (HVDC) line between the Fano (Center North) and Villanova (Center South) substations, in order to overcome environmental and social constrains and allow a full integration of Southern renewable sources. This paper presents an evaluation of the operating limits of a specific portion of the Adriatic 400 kV backbone, both in its current configuration and after the installation of the new HVDC link.\",\"PeriodicalId\":186931,\"journal\":{\"name\":\"2019 AEIT HVDC International Conference (AEIT HVDC)\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 AEIT HVDC International Conference (AEIT HVDC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AEIT-HVDC.2019.8740556\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 AEIT HVDC International Conference (AEIT HVDC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AEIT-HVDC.2019.8740556","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

沿着亚得里亚海海岸,意大利的输电系统由一条400千伏的南北线路组成。这限制了中北部和中南部市场区域之间的电力传输能力,并且在意大利南部高可再生能源发电的情况下存在过载风险。2019年网络发展计划预计在Fano(中北部)和Villanova(中南部)变电站之间安装海底高压直流(HVDC)线路,以克服环境和社会限制,并允许南部可再生能源的全面整合。本文对亚得里亚海400千伏主干网某一特定部分的运行极限进行了评估,包括其当前配置和安装新的高压直流线路后的运行极限。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Renewable sources integration using HVDC in parallel to AC traditional system: the Adriatic project
Along the Adriatic coast, the Italian transmission system consists of a single 400 kV North-South Line. This limits the power transfer capacity between the Center North and Center South market zones and with the risk of overload in case of high renewable generation in Southern Italy. The year 2019 Network Development Plan foresaw the installation of a submarine High Voltage Direct Current (HVDC) line between the Fano (Center North) and Villanova (Center South) substations, in order to overcome environmental and social constrains and allow a full integration of Southern renewable sources. This paper presents an evaluation of the operating limits of a specific portion of the Adriatic 400 kV backbone, both in its current configuration and after the installation of the new HVDC link.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A comparison of non-unit and unit protection algorithms for HVDC grids Capacitor Voltage Ripple Minimization in Voltage Source Converter for HVDC Applications Use of VSC-HVDC links for power system restoration INELFE: main description and operational experience over three years in service Impact of SA.CO.I. refurbishment: flexibility analysis of the Sardinian system
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1