{"title":"基于trl的成本和进度模型的假设框架","authors":"Bernard El-Khoury, C. Robert Kenley","doi":"10.1080/1941658X.2014.982232","DOIUrl":null,"url":null,"abstract":"The Technology Readiness Level scale has been used to assess progress and provide a framework for developing technology. Many Technology Readiness Level-based cost and schedule models have been developed to monitor technology maturation, mitigate program risk, characterize transition times, or model schedule and cost risk for individual technologies as well technology systems and portfolios. We present a four-level classification of models based on the often-implicit assumptions they make. For each level, we clarify the assumptions made, review evidence that supports the assumptions, and propose alternative or improved models. Our results include a justification of the recommendations of the US General Accounting Office on Technology Readiness Level, two new methodologies for robust estimation of median transition times and for forecasting transition times using historical data, and a set of recommendations for Technology Readiness Level-based regression models.","PeriodicalId":390877,"journal":{"name":"Journal of Cost Analysis and Parametrics","volume":"61 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-09-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"An Assumptions-Based Framework for TRL-Based Cost and Schedule Models\",\"authors\":\"Bernard El-Khoury, C. Robert Kenley\",\"doi\":\"10.1080/1941658X.2014.982232\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Technology Readiness Level scale has been used to assess progress and provide a framework for developing technology. Many Technology Readiness Level-based cost and schedule models have been developed to monitor technology maturation, mitigate program risk, characterize transition times, or model schedule and cost risk for individual technologies as well technology systems and portfolios. We present a four-level classification of models based on the often-implicit assumptions they make. For each level, we clarify the assumptions made, review evidence that supports the assumptions, and propose alternative or improved models. Our results include a justification of the recommendations of the US General Accounting Office on Technology Readiness Level, two new methodologies for robust estimation of median transition times and for forecasting transition times using historical data, and a set of recommendations for Technology Readiness Level-based regression models.\",\"PeriodicalId\":390877,\"journal\":{\"name\":\"Journal of Cost Analysis and Parametrics\",\"volume\":\"61 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-09-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Cost Analysis and Parametrics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/1941658X.2014.982232\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Cost Analysis and Parametrics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/1941658X.2014.982232","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
An Assumptions-Based Framework for TRL-Based Cost and Schedule Models
The Technology Readiness Level scale has been used to assess progress and provide a framework for developing technology. Many Technology Readiness Level-based cost and schedule models have been developed to monitor technology maturation, mitigate program risk, characterize transition times, or model schedule and cost risk for individual technologies as well technology systems and portfolios. We present a four-level classification of models based on the often-implicit assumptions they make. For each level, we clarify the assumptions made, review evidence that supports the assumptions, and propose alternative or improved models. Our results include a justification of the recommendations of the US General Accounting Office on Technology Readiness Level, two new methodologies for robust estimation of median transition times and for forecasting transition times using historical data, and a set of recommendations for Technology Readiness Level-based regression models.