{"title":"气泵-一种气驱容积泵人工举升系统","authors":"Stephen W. Turk, Michael Juenke","doi":"10.2118/209748-ms","DOIUrl":null,"url":null,"abstract":"\n Many resource play (shale) reservoirs have been drilled with highly tortuous wells. These wells are difficult to produce in their late life when production rates and pressures decline to the point where positive displacement pumping becomes necessary. Reciprocating rod pump (RRP) systems are expensive to install and operate in these conditions. RRPs’ inherent issues with friction and wear and tear on equipment are exacerbated in these kinds of crooked wells.\n Gas Pump (GP) is a newly invented artificial lift system that provides the benefits of positive displacement pumping for these kinds of wells without the inherent installation costs and failure risks associated with RRP. GP uses high pressure natural gas to blow liquids out of a bottom hole accumulator chamber into the tubing (like RRP) all while isolating the reservoir from the backpressure of the column of liquid standing in the tubing, thereby enabling maximum reservoir pressure drawdown.\n This paper will describe the theory behind GP's technical design and mechanical application, relay the practical equipment design and testing processes used to progress the system from concept to prototype, and conclude with GP's prototype performance assessment.","PeriodicalId":113398,"journal":{"name":"Day 2 Wed, August 24, 2022","volume":"72 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Gas Pump – A Gas-Driven Positive Displacement Pump Artificial Lift System\",\"authors\":\"Stephen W. Turk, Michael Juenke\",\"doi\":\"10.2118/209748-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Many resource play (shale) reservoirs have been drilled with highly tortuous wells. These wells are difficult to produce in their late life when production rates and pressures decline to the point where positive displacement pumping becomes necessary. Reciprocating rod pump (RRP) systems are expensive to install and operate in these conditions. RRPs’ inherent issues with friction and wear and tear on equipment are exacerbated in these kinds of crooked wells.\\n Gas Pump (GP) is a newly invented artificial lift system that provides the benefits of positive displacement pumping for these kinds of wells without the inherent installation costs and failure risks associated with RRP. GP uses high pressure natural gas to blow liquids out of a bottom hole accumulator chamber into the tubing (like RRP) all while isolating the reservoir from the backpressure of the column of liquid standing in the tubing, thereby enabling maximum reservoir pressure drawdown.\\n This paper will describe the theory behind GP's technical design and mechanical application, relay the practical equipment design and testing processes used to progress the system from concept to prototype, and conclude with GP's prototype performance assessment.\",\"PeriodicalId\":113398,\"journal\":{\"name\":\"Day 2 Wed, August 24, 2022\",\"volume\":\"72 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-08-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Wed, August 24, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/209748-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, August 24, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/209748-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

许多资源层(页岩)都是用大弯曲井钻探的。当产量和压力下降到一定程度时,这些井很难在其后期进行生产,因此需要进行正置换泵注。在这些条件下,往复杆泵(RRP)系统的安装和运行成本很高。在这种弯曲井中,rrp固有的摩擦和设备磨损问题更加严重。气泵(GP)是一种新发明的人工举升系统,它为这类井提供了正排量泵的优点,而没有固有的安装成本和与RRP相关的故障风险。GP使用高压天然气将液体从底部蓄能器室吹到油管中(如RRP),同时将储层与油管中液体柱的背压隔离,从而实现最大的储层压降。本文将描述GP的技术设计和机械应用背后的理论,介绍系统从概念到原型所使用的实际设备设计和测试过程,并以GP的原型性能评估结束。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Gas Pump – A Gas-Driven Positive Displacement Pump Artificial Lift System
Many resource play (shale) reservoirs have been drilled with highly tortuous wells. These wells are difficult to produce in their late life when production rates and pressures decline to the point where positive displacement pumping becomes necessary. Reciprocating rod pump (RRP) systems are expensive to install and operate in these conditions. RRPs’ inherent issues with friction and wear and tear on equipment are exacerbated in these kinds of crooked wells. Gas Pump (GP) is a newly invented artificial lift system that provides the benefits of positive displacement pumping for these kinds of wells without the inherent installation costs and failure risks associated with RRP. GP uses high pressure natural gas to blow liquids out of a bottom hole accumulator chamber into the tubing (like RRP) all while isolating the reservoir from the backpressure of the column of liquid standing in the tubing, thereby enabling maximum reservoir pressure drawdown. This paper will describe the theory behind GP's technical design and mechanical application, relay the practical equipment design and testing processes used to progress the system from concept to prototype, and conclude with GP's prototype performance assessment.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Accurate Gas-To-Pump Calculation in Pumping Oil Wells from Surface Data Using Combined Analytical Modeling of Gaseous Static Liquids Gradient: Part 1 Improve ESP Pump Sizing Through Enhanced Performance Prediction of ESP Stages in Two-Phase Flow Applications New Mechanism of Sand Management Above ESPs: Cases Study in Colombia Gas Lift Valve Bellow Protection from High Injection and Dome Pressure Closed Loop Gas-Lift Optimization
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1