{"title":"利用计算机软件和地理技术对尼日利亚贝宁市环境退化的矿区进行复垦研究","authors":"Iroakazi Kalu Kalu, Emmanuel Opeyemi, Olanrewaju Alaba Clement","doi":"10.5897/jgmr2021.0356","DOIUrl":null,"url":null,"abstract":"Land degradation in the form of creation of massive pits, and deforestation of land are some adverse impacts associated with open pit mining activities. Benin City and its environs have witnessed a high proliferation of open pit sand and/ laterite mining activities popularly called borrow pits in recent times, with its associated environmental risk. This research is carried on five selected sand mines in Benin City to estimate the cumulative land area degraded as a result of sand mining operations, thus it determines the level of environmental damage done and quantity of material required for refilling and reclamation. The method involves the use of a GPS based geomatics technique to acquire GIS data of five selected open pit sand mines, as well as computer softwares for the analysis, and area and/volume studies. The result showed that sites A, B, C, D, and E deforested a land area of 17,923.125, 33,991.803, 36,038.761, 13,212.545, and 2,882.046 m2 respectively; while the volume of excavation created by the five sites are respectively 1,792,154.644, 4,992,730.898, 2,701,846.644, 9,878,111.857, and 134,258.932 m3. Thus, a cumulative area of 104,048 m² of land was deforested in the five sites while 19,499,102.98 m³ of excavation was cumulatively created which requires refilling and total reclamation.","PeriodicalId":430415,"journal":{"name":"Journal of Geology and Mining Research","volume":"73 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Use of computer softwares and geomatic techniques for reclamation study of environmentally degraded mined lands in Benin City, Nigeria\",\"authors\":\"Iroakazi Kalu Kalu, Emmanuel Opeyemi, Olanrewaju Alaba Clement\",\"doi\":\"10.5897/jgmr2021.0356\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Land degradation in the form of creation of massive pits, and deforestation of land are some adverse impacts associated with open pit mining activities. Benin City and its environs have witnessed a high proliferation of open pit sand and/ laterite mining activities popularly called borrow pits in recent times, with its associated environmental risk. This research is carried on five selected sand mines in Benin City to estimate the cumulative land area degraded as a result of sand mining operations, thus it determines the level of environmental damage done and quantity of material required for refilling and reclamation. The method involves the use of a GPS based geomatics technique to acquire GIS data of five selected open pit sand mines, as well as computer softwares for the analysis, and area and/volume studies. The result showed that sites A, B, C, D, and E deforested a land area of 17,923.125, 33,991.803, 36,038.761, 13,212.545, and 2,882.046 m2 respectively; while the volume of excavation created by the five sites are respectively 1,792,154.644, 4,992,730.898, 2,701,846.644, 9,878,111.857, and 134,258.932 m3. Thus, a cumulative area of 104,048 m² of land was deforested in the five sites while 19,499,102.98 m³ of excavation was cumulatively created which requires refilling and total reclamation.\",\"PeriodicalId\":430415,\"journal\":{\"name\":\"Journal of Geology and Mining Research\",\"volume\":\"73 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Geology and Mining Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5897/jgmr2021.0356\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Geology and Mining Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5897/jgmr2021.0356","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

露天采矿活动的一些不利影响是土地退化,其形式是形成大量的坑,以及土地的毁林。最近,贝宁市及其周边地区的露天砂和/红土开采活动大量增加,这些活动通常被称为“借土坑”,并带来相关的环境风险。本研究在贝宁市选定的五个沙矿进行,以估计采砂作业造成的累积土地退化面积,从而确定对环境造成的破坏程度以及填土和复垦所需的材料数量。该方法包括使用基于全球定位系统的地理信息技术来获取五个选定的露天矿的地理信息系统数据,以及用于分析和面积和/或体积研究的计算机软件。结果表明:A、B、C、D、E样地的毁林面积分别为17,923.125、33,991.803、36,038.761、13,212.545和2,882.046 m2;而5个遗址的开采量分别为1,792,154.644、4,992,730.898、2,701,846.644、9,878,111.857、134,258.932 m3。因此,五个站点的森林砍伐面积累计为104,048 m²,而累积产生的挖掘面积为19,499,102.98 m³,需要重新填充和完全填海。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Use of computer softwares and geomatic techniques for reclamation study of environmentally degraded mined lands in Benin City, Nigeria
Land degradation in the form of creation of massive pits, and deforestation of land are some adverse impacts associated with open pit mining activities. Benin City and its environs have witnessed a high proliferation of open pit sand and/ laterite mining activities popularly called borrow pits in recent times, with its associated environmental risk. This research is carried on five selected sand mines in Benin City to estimate the cumulative land area degraded as a result of sand mining operations, thus it determines the level of environmental damage done and quantity of material required for refilling and reclamation. The method involves the use of a GPS based geomatics technique to acquire GIS data of five selected open pit sand mines, as well as computer softwares for the analysis, and area and/volume studies. The result showed that sites A, B, C, D, and E deforested a land area of 17,923.125, 33,991.803, 36,038.761, 13,212.545, and 2,882.046 m2 respectively; while the volume of excavation created by the five sites are respectively 1,792,154.644, 4,992,730.898, 2,701,846.644, 9,878,111.857, and 134,258.932 m3. Thus, a cumulative area of 104,048 m² of land was deforested in the five sites while 19,499,102.98 m³ of excavation was cumulatively created which requires refilling and total reclamation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Direction of material creep during the deformation phase in shear zones, role in mining prospecting: A case of the Nassara-Torkera gold deposits in the Gaoua region, Burkina Faso, West Africa Identification of iron ores in Sierra Leone, Africa by using remote sensing techniques Application of Legrand pollution correlation in the evaluation of contaminants migration within the groundwater of Ebhoakhuala in Ekpoma and Agbede, Edo State, Nigeria Use of computer softwares and geomatic techniques for reclamation study of environmentally degraded mined lands in Benin City, Nigeria A Review of Agrogeological resources of Nigeria
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1