2014 - 2018年软件行业目标

Capers Jones
{"title":"2014 - 2018年软件行业目标","authors":"Capers Jones","doi":"10.1080/1941658X.2014.890493","DOIUrl":null,"url":null,"abstract":"This article discusses 20 quantitative targets for software engineering projects that are technically feasible to be achieved within a five year window. Some leading companies have already achieved many of these targets, but average and lagging companies have achieved only a few, if any. Software needs firm achievable goals expressed in quantitative fashion. For example the first goal is to remove 99.5% of bugs or defects before delivery rather than today’s average of below 90%. Inspections and static analysis prior to testing can achieve this goal for essentially every project.","PeriodicalId":390877,"journal":{"name":"Journal of Cost Analysis and Parametrics","volume":"83 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-01-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Software Industry Goals for the Years 2014 through 2018\",\"authors\":\"Capers Jones\",\"doi\":\"10.1080/1941658X.2014.890493\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article discusses 20 quantitative targets for software engineering projects that are technically feasible to be achieved within a five year window. Some leading companies have already achieved many of these targets, but average and lagging companies have achieved only a few, if any. Software needs firm achievable goals expressed in quantitative fashion. For example the first goal is to remove 99.5% of bugs or defects before delivery rather than today’s average of below 90%. Inspections and static analysis prior to testing can achieve this goal for essentially every project.\",\"PeriodicalId\":390877,\"journal\":{\"name\":\"Journal of Cost Analysis and Parametrics\",\"volume\":\"83 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-01-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Cost Analysis and Parametrics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/1941658X.2014.890493\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Cost Analysis and Parametrics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/1941658X.2014.890493","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本文讨论了软件工程项目的20个量化目标,这些目标在技术上是可行的,可以在5年内实现。一些领先的公司已经实现了其中的许多目标,但一般和落后的公司只实现了少数目标。软件需要以定量方式表达的可实现的目标。例如,第一个目标是在交付之前消除99.5%的错误或缺陷,而不是今天的平均水平低于90%。测试之前的检查和静态分析基本上可以为每个项目实现这一目标。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Software Industry Goals for the Years 2014 through 2018
This article discusses 20 quantitative targets for software engineering projects that are technically feasible to be achieved within a five year window. Some leading companies have already achieved many of these targets, but average and lagging companies have achieved only a few, if any. Software needs firm achievable goals expressed in quantitative fashion. For example the first goal is to remove 99.5% of bugs or defects before delivery rather than today’s average of below 90%. Inspections and static analysis prior to testing can achieve this goal for essentially every project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Editorial Board EOV Multiproduct Cost-Volume-Profit Model: A Resource Reallocation Approach for Decision Making Dynamics of New Building Construction Costs: Implications for Forecasting Escalation Allowances Balancing Expert Opinion and Historical Data: The Case of Baseball Umpires Using Robust Statistical Methodology to Evaluate the Cost Performance of Project Delivery Systems: A Case Study of Horizontal Construction
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1