{"title":"抽水蓄能电站水锤和浪涌随机分析研究进展","authors":"Yuang Jian, Shu Jin, Liu Dong","doi":"10.1109/URKE.2012.6319583","DOIUrl":null,"url":null,"abstract":"Change of waterhammer and surge with time is considered as a stochastic process. Then the purpose, present status and progress of stochastic analysis of waterhammer and surge in pumped storage plant are summarized. Stochastic analysis methods are introduced, including modeling and solving. Finally, some suggestions are presented for stochastic analysis.","PeriodicalId":277189,"journal":{"name":"2012 2nd International Conference on Uncertainty Reasoning and Knowledge Engineering","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-10-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Progress of stochastic analysis of waterhammer and surge in pumped storage plant\",\"authors\":\"Yuang Jian, Shu Jin, Liu Dong\",\"doi\":\"10.1109/URKE.2012.6319583\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Change of waterhammer and surge with time is considered as a stochastic process. Then the purpose, present status and progress of stochastic analysis of waterhammer and surge in pumped storage plant are summarized. Stochastic analysis methods are introduced, including modeling and solving. Finally, some suggestions are presented for stochastic analysis.\",\"PeriodicalId\":277189,\"journal\":{\"name\":\"2012 2nd International Conference on Uncertainty Reasoning and Knowledge Engineering\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-10-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 2nd International Conference on Uncertainty Reasoning and Knowledge Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/URKE.2012.6319583\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 2nd International Conference on Uncertainty Reasoning and Knowledge Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/URKE.2012.6319583","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Progress of stochastic analysis of waterhammer and surge in pumped storage plant
Change of waterhammer and surge with time is considered as a stochastic process. Then the purpose, present status and progress of stochastic analysis of waterhammer and surge in pumped storage plant are summarized. Stochastic analysis methods are introduced, including modeling and solving. Finally, some suggestions are presented for stochastic analysis.