Afan Allail Rofikha, Suwanto Marsudi, Evi Nur Cahya
{"title":"Analisis Struktur Terowongan Pengelak Pada Bendungan Kualu Kabupaten Toba Samosir Provinsi Sumatra Utara","authors":"Afan Allail Rofikha, Suwanto Marsudi, Evi Nur Cahya","doi":"10.21776/UB.PENGAIRAN.2019.010.01.3","DOIUrl":null,"url":null,"abstract":"Diversion structure consists of diversion tunnel and Cofferdam. These two contructions should built in the early construction of the dam, have function to divert the river flow during the period of dam construction. The plans of Kualu dam diversion tunnel designed using horseshoe shape F, upstream of the tunnel at a depth of 41.625 m and upstream elevation + 695.5 m. In this study there was flood routing with Q25th which is 709,331 m 3 /s and obtained using 9 m diameter, then a cofferdam is planned to build as high as 15 m. Based on the calculation of loading and calculated four load combinations, they are : after contruction condition, after contruction under earthquake condition, at the operation time condition, and at the operation time under earthquake condition. From the results of the load combinations, the structure was analyzed using Beggs method and Staad Pro method. These two methods were used to figure the maximum moment of the structure and to determine the needed reinforcement in the tunnel construction. After the analysis, it is noticed that there is a difference position of the maximum moment, this is caused by the support in the Beggs method assumed to be a vertical loads.","PeriodicalId":236511,"journal":{"name":"Jurnal Teknik Pengairan","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Pengairan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21776/UB.PENGAIRAN.2019.010.01.3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

导流结构由导流隧洞和围堰组成。这两个构筑物应建在大坝建设初期,在大坝建设期间具有分流河水的功能。夸鲁坝引水隧洞方案设计采用马蹄形F形,隧洞上游深度41.625 m,上游标高+ 695.5 m。在本研究中,q25的洪水路径为709,331 m 3 /s,使用9 m直径获得,则计划建造15 m高的围堰。在荷载计算的基础上,计算出四种荷载组合,分别是:施工后工况、地震工况下施工后工况、运行时工况、地震工况下运行时工况。根据荷载组合结果,采用Beggs法和Staad Pro法对结构进行分析。这两种方法用于计算结构的最大弯矩和确定隧道施工中所需的配筋。分析后,注意到最大弯矩的位置存在差异,这是由于Beggs方法中假设的支撑为垂直荷载造成的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Analisis Struktur Terowongan Pengelak Pada Bendungan Kualu Kabupaten Toba Samosir Provinsi Sumatra Utara
Diversion structure consists of diversion tunnel and Cofferdam. These two contructions should built in the early construction of the dam, have function to divert the river flow during the period of dam construction. The plans of Kualu dam diversion tunnel designed using horseshoe shape F, upstream of the tunnel at a depth of 41.625 m and upstream elevation + 695.5 m. In this study there was flood routing with Q25th which is 709,331 m 3 /s and obtained using 9 m diameter, then a cofferdam is planned to build as high as 15 m. Based on the calculation of loading and calculated four load combinations, they are : after contruction condition, after contruction under earthquake condition, at the operation time condition, and at the operation time under earthquake condition. From the results of the load combinations, the structure was analyzed using Beggs method and Staad Pro method. These two methods were used to figure the maximum moment of the structure and to determine the needed reinforcement in the tunnel construction. After the analysis, it is noticed that there is a difference position of the maximum moment, this is caused by the support in the Beggs method assumed to be a vertical loads.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analisis Prioritas Rehabilitasi Jaringan Irigasi Menggunakan Metode Simple Additive Weighting di Aliran Sungai Jompo Studi Alternatif Pengendalian Banjir Sungai Welang dengan Pendekatan Pemodelan Banjir Aliran 2D Zonasi Tingkat Kerawanan Banjir Bandang dengan Sistem Informasi Geografis di Sub-DAS Kaliputih Kabupaten Jember Evaluasi Pendangkalan Pelabuhan Penyeberangan Bira Sulawesi Selatan Dan Usaha Untuk Menanganinya Efektivitas Penerapan Teknologi Pada IPAL Komunal Ditinjau Dari Parameter BOD, COD, dan TSS
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1