西部电力走廊项目——横跨南部非洲的大规模水力发电和输电规划

P. Naidoo, B.M. Mbuere, G. Kelesitse, J. Ventura, M. Musanda
{"title":"西部电力走廊项目——横跨南部非洲的大规模水力发电和输电规划","authors":"P. Naidoo, B.M. Mbuere, G. Kelesitse, J. Ventura, M. Musanda","doi":"10.1109/PESAFR.2005.1611776","DOIUrl":null,"url":null,"abstract":"The Westcor project is intended to exploit the environmentally friendly, renewable, hydroelectric energy of the Inga rapids site in the Democratic Republic of Congo (DRC). First pass studies show that HVAC is inadequate and that conventional HVDC at 500 kV is acceptable for low loads over the long distance. For higher loads, it will be required to increase the operating voltage. First pass studies show that 3 GW could be transmitted over the 4000 km long distance at an operating voltage of 800 kV. For the present day, the engineering focus is on conducting the pre feasibility studies, the feasibility studies and preparing the project for financial closure. The customers for the energy off take are the participating utilities and the tariff would largely be determined by the overall capital costs","PeriodicalId":270664,"journal":{"name":"2005 IEEE Power Engineering Society Inaugural Conference and Exposition in Africa","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"The western power corridor project - the planning for large scale hydro electric power generation and transmission across Southern Africa\",\"authors\":\"P. Naidoo, B.M. Mbuere, G. Kelesitse, J. Ventura, M. Musanda\",\"doi\":\"10.1109/PESAFR.2005.1611776\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Westcor project is intended to exploit the environmentally friendly, renewable, hydroelectric energy of the Inga rapids site in the Democratic Republic of Congo (DRC). First pass studies show that HVAC is inadequate and that conventional HVDC at 500 kV is acceptable for low loads over the long distance. For higher loads, it will be required to increase the operating voltage. First pass studies show that 3 GW could be transmitted over the 4000 km long distance at an operating voltage of 800 kV. For the present day, the engineering focus is on conducting the pre feasibility studies, the feasibility studies and preparing the project for financial closure. The customers for the energy off take are the participating utilities and the tariff would largely be determined by the overall capital costs\",\"PeriodicalId\":270664,\"journal\":{\"name\":\"2005 IEEE Power Engineering Society Inaugural Conference and Exposition in Africa\",\"volume\":\"18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-07-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2005 IEEE Power Engineering Society Inaugural Conference and Exposition in Africa\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PESAFR.2005.1611776\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005 IEEE Power Engineering Society Inaugural Conference and Exposition in Africa","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESAFR.2005.1611776","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

摘要

Westcor项目旨在开发刚果民主共和国因加急流地区的环保、可再生水电能源。第一次通过的研究表明,暖通空调是不够的,传统的500千伏的高压直流输电是可以接受的,用于长距离的低负荷。对于更高的负载,需要提高工作电压。初步研究表明,在800千伏的工作电压下,3gw的电力可以传输4000公里。目前,工程重点是进行预可行性研究、可行性研究和为项目财务收尾做准备。能源回收的客户是参与的公用事业公司,而关税将在很大程度上取决于总体资本成本
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The western power corridor project - the planning for large scale hydro electric power generation and transmission across Southern Africa
The Westcor project is intended to exploit the environmentally friendly, renewable, hydroelectric energy of the Inga rapids site in the Democratic Republic of Congo (DRC). First pass studies show that HVAC is inadequate and that conventional HVDC at 500 kV is acceptable for low loads over the long distance. For higher loads, it will be required to increase the operating voltage. First pass studies show that 3 GW could be transmitted over the 4000 km long distance at an operating voltage of 800 kV. For the present day, the engineering focus is on conducting the pre feasibility studies, the feasibility studies and preparing the project for financial closure. The customers for the energy off take are the participating utilities and the tariff would largely be determined by the overall capital costs
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A fundamental learning from the failed Californian Power Exchange and Californian Independent System Operator Model of 1995 to 2001 Operational experience of 800 kV series capacitors The impact of harmonic resonance conditions on the connection rules for large industrial installations Cost benefit of using a committee of parallel neural networks for bushing diagnostics Anticipating the expansion of power facilities in Africa to meet increasing demand for electricity
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1