电池储能系统充放电循环次数的选择

L. Petrichenko, R. Petrichenko, A. Sauhats
{"title":"电池储能系统充放电循环次数的选择","authors":"L. Petrichenko, R. Petrichenko, A. Sauhats","doi":"10.1109/RTUCON48111.2019.8982316","DOIUrl":null,"url":null,"abstract":"In this paper, our aim is to develop the model of weekly BESS scheduling and thus consider the type and parameters of the BESS, as well as present the algorithms of BESS charge/discharge cycle distribution. To achieve this goal, we analyse how the number of charge/discharge cycles performed during the planning period affects the revenue potential of energy storage. The objective function of the optimisation problem is formulated in the form of weekly avoided costs. A limited number of cycles per week is distributed day by day, using an optimisation procedure, since the optimal distribution is not uniform.","PeriodicalId":317349,"journal":{"name":"2019 IEEE 60th International Scientific Conference on Power and Electrical Engineering of Riga Technical University (RTUCON)","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"The Choice of the Number of Charge/Discharge Cycles for a Battery Energy Storage System\",\"authors\":\"L. Petrichenko, R. Petrichenko, A. Sauhats\",\"doi\":\"10.1109/RTUCON48111.2019.8982316\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, our aim is to develop the model of weekly BESS scheduling and thus consider the type and parameters of the BESS, as well as present the algorithms of BESS charge/discharge cycle distribution. To achieve this goal, we analyse how the number of charge/discharge cycles performed during the planning period affects the revenue potential of energy storage. The objective function of the optimisation problem is formulated in the form of weekly avoided costs. A limited number of cycles per week is distributed day by day, using an optimisation procedure, since the optimal distribution is not uniform.\",\"PeriodicalId\":317349,\"journal\":{\"name\":\"2019 IEEE 60th International Scientific Conference on Power and Electrical Engineering of Riga Technical University (RTUCON)\",\"volume\":\"36 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 IEEE 60th International Scientific Conference on Power and Electrical Engineering of Riga Technical University (RTUCON)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/RTUCON48111.2019.8982316\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE 60th International Scientific Conference on Power and Electrical Engineering of Riga Technical University (RTUCON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RTUCON48111.2019.8982316","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在本文中,我们的目的是建立每周BESS调度模型,从而考虑BESS的类型和参数,并提出BESS充放电周期分配的算法。为了实现这一目标,我们分析了在规划期间执行的充电/放电循环次数如何影响储能的收入潜力。优化问题的目标函数以每周避免成本的形式表示。由于最佳分布不是均匀的,因此使用优化程序,每天分配每周有限数量的循环。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Choice of the Number of Charge/Discharge Cycles for a Battery Energy Storage System
In this paper, our aim is to develop the model of weekly BESS scheduling and thus consider the type and parameters of the BESS, as well as present the algorithms of BESS charge/discharge cycle distribution. To achieve this goal, we analyse how the number of charge/discharge cycles performed during the planning period affects the revenue potential of energy storage. The objective function of the optimisation problem is formulated in the form of weekly avoided costs. A limited number of cycles per week is distributed day by day, using an optimisation procedure, since the optimal distribution is not uniform.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Stochastic Nonlinear Excitation Controller for Transient Stabilization in a Power System Analysis of Cost Function Composition based on the Horizon Time Prediction of an Indirect MPC Current Control in Single-Phase Grid-Connected PV Inverters A Space Vector Based Tool for the Visualisation of Induction Machine Operation Modes Effects of PWM Dimming LED Illumination on Camera Images and Countermeasures Demonstration of the use of robotics in the development of a scrap processing model for mechatronic education
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1