E. Gladkikh, M. Alvarez‐Herault, B. Raison, V. Vai, L. Bun
{"title":"负荷需求不确定性下的低压配电系统规划:随新负荷接入的增长率","authors":"E. Gladkikh, M. Alvarez‐Herault, B. Raison, V. Vai, L. Bun","doi":"10.1109/IEECON.2017.8075739","DOIUrl":null,"url":null,"abstract":"This paper presents a novel algorithm to optimize a topology for tackling the challenge of increasing uncertainty on load demand (growth rate with connection of new loads) in low-voltage (LV) distribution. This paper aims at finding which load connection phase induces the lowest costs (investment and power losses) and phase balancing while satisfying the techno-economic aspects over planning study. A mixed integer quadratically constrained programming (MIQCP) and shortest path-bin packing with arborescence flow are developed to perform this work. To illustrate this method, the example of LV distribution (33 bus) is chosen to be a case study of an initial year. Monte-Carlo (MC) simulation method is employed to evaluate the results. The simulation results obtained on test system support an effectiveness of method.","PeriodicalId":196081,"journal":{"name":"2017 International Electrical Engineering Congress (iEECON)","volume":"96 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"Low-voltage distribution system planning under load demand uncertainty: Growth rate with connection of new loads\",\"authors\":\"E. Gladkikh, M. Alvarez‐Herault, B. Raison, V. Vai, L. Bun\",\"doi\":\"10.1109/IEECON.2017.8075739\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a novel algorithm to optimize a topology for tackling the challenge of increasing uncertainty on load demand (growth rate with connection of new loads) in low-voltage (LV) distribution. This paper aims at finding which load connection phase induces the lowest costs (investment and power losses) and phase balancing while satisfying the techno-economic aspects over planning study. A mixed integer quadratically constrained programming (MIQCP) and shortest path-bin packing with arborescence flow are developed to perform this work. To illustrate this method, the example of LV distribution (33 bus) is chosen to be a case study of an initial year. Monte-Carlo (MC) simulation method is employed to evaluate the results. The simulation results obtained on test system support an effectiveness of method.\",\"PeriodicalId\":196081,\"journal\":{\"name\":\"2017 International Electrical Engineering Congress (iEECON)\",\"volume\":\"96 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 International Electrical Engineering Congress (iEECON)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEECON.2017.8075739\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Electrical Engineering Congress (iEECON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEECON.2017.8075739","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Low-voltage distribution system planning under load demand uncertainty: Growth rate with connection of new loads
This paper presents a novel algorithm to optimize a topology for tackling the challenge of increasing uncertainty on load demand (growth rate with connection of new loads) in low-voltage (LV) distribution. This paper aims at finding which load connection phase induces the lowest costs (investment and power losses) and phase balancing while satisfying the techno-economic aspects over planning study. A mixed integer quadratically constrained programming (MIQCP) and shortest path-bin packing with arborescence flow are developed to perform this work. To illustrate this method, the example of LV distribution (33 bus) is chosen to be a case study of an initial year. Monte-Carlo (MC) simulation method is employed to evaluate the results. The simulation results obtained on test system support an effectiveness of method.