多功能安全系统设备最优供电网络设计

Artyom M. Kalney, D. Migov, T. Nasibullina, A. Rodionov, Kirill V. Tkachev, G. Toktoshov
{"title":"多功能安全系统设备最优供电网络设计","authors":"Artyom M. Kalney, D. Migov, T. Nasibullina, A. Rodionov, Kirill V. Tkachev, G. Toktoshov","doi":"10.1109/OPCS.2019.8880253","DOIUrl":null,"url":null,"abstract":"The task of calculating and optimizing reliability of power networks in coal mines is examined. One of main parts of engineering equipment, which supports functioning of telecommunication networks in coal mines, is wire network of power supply, requirements for which highly depend on specific environment. optimization task is stated and some results concerning choosing points of connection with outer power networks are presented.","PeriodicalId":288547,"journal":{"name":"2019 15th International Asian School-Seminar Optimization Problems of Complex Systems (OPCS)","volume":"101 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Designing of Optimal Power Supply Networks for the Equipment of Multifunctional Safety Systems (MFSS)\",\"authors\":\"Artyom M. Kalney, D. Migov, T. Nasibullina, A. Rodionov, Kirill V. Tkachev, G. Toktoshov\",\"doi\":\"10.1109/OPCS.2019.8880253\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The task of calculating and optimizing reliability of power networks in coal mines is examined. One of main parts of engineering equipment, which supports functioning of telecommunication networks in coal mines, is wire network of power supply, requirements for which highly depend on specific environment. optimization task is stated and some results concerning choosing points of connection with outer power networks are presented.\",\"PeriodicalId\":288547,\"journal\":{\"name\":\"2019 15th International Asian School-Seminar Optimization Problems of Complex Systems (OPCS)\",\"volume\":\"101 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 15th International Asian School-Seminar Optimization Problems of Complex Systems (OPCS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/OPCS.2019.8880253\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 15th International Asian School-Seminar Optimization Problems of Complex Systems (OPCS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/OPCS.2019.8880253","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

探讨了煤矿电网可靠性计算与优化的任务。支撑煤矿通信网运行的主要工程设备之一是有线供电网络,其要求与具体环境有很大关系。阐述了优化任务,并给出了与外网接入点选择的一些结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Designing of Optimal Power Supply Networks for the Equipment of Multifunctional Safety Systems (MFSS)
The task of calculating and optimizing reliability of power networks in coal mines is examined. One of main parts of engineering equipment, which supports functioning of telecommunication networks in coal mines, is wire network of power supply, requirements for which highly depend on specific environment. optimization task is stated and some results concerning choosing points of connection with outer power networks are presented.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The Integrated Computational Environment for Optimization of Complex Systems Approaches to Recognize Cavity Inclusions in Elastic Media in Problem of Monitoring Test Sites Formation of Optimal Communication Service Portfolio for Corporate Clients Numerical Solution of the Coefficient Inverse Problem for a Production-Destruction Model with Various Adjoint Ensemble Designs On Models of Economic Development, Taking Into Account Lending
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1