{"title":"研究提高迪拜分销网络利用率的机会","authors":"Abdulla Al Aghbari, M. A. Neaimi, Muhannad Ashaar","doi":"10.1109/EPQU.2011.6128937","DOIUrl":null,"url":null,"abstract":"This paper illustrates the main factors that affect the utilization of Distribution Network in Dubai. In addition, it demonstrates DEWA's experience in enhancing the utilization, actions to overcome some technical limitations and real measurements of variables that can affect the utilization. The technical illustration can be considered as a real good model for Gulf Cooperation Council Countries (GCC) since the environmental conditions are very similar to Dubai's case.","PeriodicalId":369941,"journal":{"name":"11th International Conference on Electrical Power Quality and Utilisation","volume":"102 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Study the opportunities of enhancing the utilization of Distribution Network in Dubai\",\"authors\":\"Abdulla Al Aghbari, M. A. Neaimi, Muhannad Ashaar\",\"doi\":\"10.1109/EPQU.2011.6128937\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper illustrates the main factors that affect the utilization of Distribution Network in Dubai. In addition, it demonstrates DEWA's experience in enhancing the utilization, actions to overcome some technical limitations and real measurements of variables that can affect the utilization. The technical illustration can be considered as a real good model for Gulf Cooperation Council Countries (GCC) since the environmental conditions are very similar to Dubai's case.\",\"PeriodicalId\":369941,\"journal\":{\"name\":\"11th International Conference on Electrical Power Quality and Utilisation\",\"volume\":\"102 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"11th International Conference on Electrical Power Quality and Utilisation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPQU.2011.6128937\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th International Conference on Electrical Power Quality and Utilisation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPQU.2011.6128937","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Study the opportunities of enhancing the utilization of Distribution Network in Dubai
This paper illustrates the main factors that affect the utilization of Distribution Network in Dubai. In addition, it demonstrates DEWA's experience in enhancing the utilization, actions to overcome some technical limitations and real measurements of variables that can affect the utilization. The technical illustration can be considered as a real good model for Gulf Cooperation Council Countries (GCC) since the environmental conditions are very similar to Dubai's case.