基于视觉的施工进度监测的竣工数据采集:因素的定性评价

VK Reja, K. Varghese, Q. Ha
{"title":"基于视觉的施工进度监测的竣工数据采集:因素的定性评价","authors":"VK Reja, K. Varghese, Q. Ha","doi":"10.31705/wcs.2022.12","DOIUrl":null,"url":null,"abstract":"The accuracy of computer vision-based progress monitoring of construction projects depends on the quality of data acquired. The data acquisition can be conducted through different vision-based sensors combined with several options for sensor mounting. Several factors affect this combination and considering these factors in selecting the acquisition technology and sensor mounting combination is critical for acquiring accurate vision-based data for the project. Currently, their definition and impact of these factors on the selection of these technologies are both subjective, and there are no formal studies to evaluate the impact. Hence, in this study, we first identify and define twelve key factors affecting data acquisition technology and eight factors affecting sensor mounting. Next, a questionnaire survey was designed, and responses from professionals were used to evaluate the Relative Importance Index (RII) for the individual factors for these technologies and methods. The obtained ratings were compared to the author's initial assessment, and the cause for a few variations obtained was justified. This study provides a clear assessment of these factors and forms a basis for selection based on the factors involved with the project requirements.","PeriodicalId":356554,"journal":{"name":"Proceedings of 10th World Construction Symposium 2022","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"As-built data acquisition for vision-based construction progress monitoring: A qualitative evaluation of factors\",\"authors\":\"VK Reja, K. Varghese, Q. Ha\",\"doi\":\"10.31705/wcs.2022.12\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The accuracy of computer vision-based progress monitoring of construction projects depends on the quality of data acquired. The data acquisition can be conducted through different vision-based sensors combined with several options for sensor mounting. Several factors affect this combination and considering these factors in selecting the acquisition technology and sensor mounting combination is critical for acquiring accurate vision-based data for the project. Currently, their definition and impact of these factors on the selection of these technologies are both subjective, and there are no formal studies to evaluate the impact. Hence, in this study, we first identify and define twelve key factors affecting data acquisition technology and eight factors affecting sensor mounting. Next, a questionnaire survey was designed, and responses from professionals were used to evaluate the Relative Importance Index (RII) for the individual factors for these technologies and methods. The obtained ratings were compared to the author's initial assessment, and the cause for a few variations obtained was justified. This study provides a clear assessment of these factors and forms a basis for selection based on the factors involved with the project requirements.\",\"PeriodicalId\":356554,\"journal\":{\"name\":\"Proceedings of 10th World Construction Symposium 2022\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of 10th World Construction Symposium 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31705/wcs.2022.12\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 10th World Construction Symposium 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31705/wcs.2022.12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

基于计算机视觉的建设工程进度监控的准确性取决于所获取数据的质量。数据采集可以通过不同的基于视觉的传感器进行,并结合几种传感器安装选项。有几个因素会影响这种组合,在选择采集技术和传感器安装组合时考虑这些因素对于获取准确的基于视觉的项目数据至关重要。目前,它们的定义和这些因素对这些技术选择的影响都是主观的,没有正式的研究来评估这些影响。因此,在本研究中,我们首先确定并定义了影响数据采集技术的12个关键因素和影响传感器安装的8个因素。其次,设计了问卷调查,并利用专业人士的回答来评估这些技术和方法的各个因素的相对重要性指数(RII)。将获得的评级与作者的初始评估进行比较,得出的一些变化的原因是合理的。这项研究对这些因素提供了一个清晰的评估,并根据项目需求所涉及的因素形成了一个选择的基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
As-built data acquisition for vision-based construction progress monitoring: A qualitative evaluation of factors
The accuracy of computer vision-based progress monitoring of construction projects depends on the quality of data acquired. The data acquisition can be conducted through different vision-based sensors combined with several options for sensor mounting. Several factors affect this combination and considering these factors in selecting the acquisition technology and sensor mounting combination is critical for acquiring accurate vision-based data for the project. Currently, their definition and impact of these factors on the selection of these technologies are both subjective, and there are no formal studies to evaluate the impact. Hence, in this study, we first identify and define twelve key factors affecting data acquisition technology and eight factors affecting sensor mounting. Next, a questionnaire survey was designed, and responses from professionals were used to evaluate the Relative Importance Index (RII) for the individual factors for these technologies and methods. The obtained ratings were compared to the author's initial assessment, and the cause for a few variations obtained was justified. This study provides a clear assessment of these factors and forms a basis for selection based on the factors involved with the project requirements.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Functional characteristics of an early warning system to minimise the risks of dam breaks in Sri Lanka Implementing Safe Working Cycle (SWC) concept amidst the COVID- 19 crisis in Sri Lanka Successful delivery of Public-Private Partnership (PPP) in the construction projects of Sri Lankan higher education sector Evaluation of construction workers mental health during COVID-19 pandemic in Nigeria Application of computer vision for construction progress monitoring
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1