管理预报工厂

Laura Bright, D. Maier, Bill Howe
{"title":"管理预报工厂","authors":"Laura Bright, D. Maier, Bill Howe","doi":"10.1109/ICDEW.2006.76","DOIUrl":null,"url":null,"abstract":"The CORIE forecast factory consists of a set of data product generation runs that are executed daily on dedicated local resources. The goal is to maximize productivity and resource utilization while still ensuring timely completion of all forecasts. Many existing workflow management systems address low-level workflow specification and execution challenges, but do not directly address the high-level challenges posed by large-scale data product factories. In this paper we discuss several specific challenges to managing the CORIE forecast factory including planning and scheduling, improving data flow, and analyzing log data, and point out their analogs in the \"physical\" manufacturing world. We present solutions we have implemented to address these challenges, and present experimental results that show the benefits of these solutions.","PeriodicalId":331953,"journal":{"name":"22nd International Conference on Data Engineering Workshops (ICDEW'06)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2006-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Managing the Forecast Factory\",\"authors\":\"Laura Bright, D. Maier, Bill Howe\",\"doi\":\"10.1109/ICDEW.2006.76\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The CORIE forecast factory consists of a set of data product generation runs that are executed daily on dedicated local resources. The goal is to maximize productivity and resource utilization while still ensuring timely completion of all forecasts. Many existing workflow management systems address low-level workflow specification and execution challenges, but do not directly address the high-level challenges posed by large-scale data product factories. In this paper we discuss several specific challenges to managing the CORIE forecast factory including planning and scheduling, improving data flow, and analyzing log data, and point out their analogs in the \\\"physical\\\" manufacturing world. We present solutions we have implemented to address these challenges, and present experimental results that show the benefits of these solutions.\",\"PeriodicalId\":331953,\"journal\":{\"name\":\"22nd International Conference on Data Engineering Workshops (ICDEW'06)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-04-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"22nd International Conference on Data Engineering Workshops (ICDEW'06)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICDEW.2006.76\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"22nd International Conference on Data Engineering Workshops (ICDEW'06)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICDEW.2006.76","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

CORIE预测工厂由一组每天在专用本地资源上执行的数据产品生成运行组成。目标是最大限度地提高生产力和资源利用率,同时仍然确保及时完成所有预测。许多现有的工作流管理系统解决了低级别的工作流规范和执行挑战,但没有直接解决大规模数据产品工厂带来的高级挑战。在本文中,我们讨论了管理CORIE预测工厂的几个具体挑战,包括计划和调度、改进数据流和分析日志数据,并指出了它们在“物理”制造世界中的类似之处。我们提出了我们为应对这些挑战而实施的解决方案,并提出了显示这些解决方案的好处的实验结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Managing the Forecast Factory
The CORIE forecast factory consists of a set of data product generation runs that are executed daily on dedicated local resources. The goal is to maximize productivity and resource utilization while still ensuring timely completion of all forecasts. Many existing workflow management systems address low-level workflow specification and execution challenges, but do not directly address the high-level challenges posed by large-scale data product factories. In this paper we discuss several specific challenges to managing the CORIE forecast factory including planning and scheduling, improving data flow, and analyzing log data, and point out their analogs in the "physical" manufacturing world. We present solutions we have implemented to address these challenges, and present experimental results that show the benefits of these solutions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Web Interface Navigation Design: Which Style of Navigation-Link Menus Do Users Prefer? Replication Based on Objects Load under a Content Distribution Network A Stochastic Approach for Trust Management A Multiple-Perspective, Interactive Approach for Web Information Extraction and Exploration Seaweed: Distributed Scalable Ad Hoc Querying
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1