影响中国总承包工程交付方式决策的关键因素

Wang Xuetong
{"title":"影响中国总承包工程交付方式决策的关键因素","authors":"Wang Xuetong","doi":"10.1109/ICCIT.2010.5711165","DOIUrl":null,"url":null,"abstract":"20 factors are selected to frame a primary factor set from 38 factors obtained through literature study. The methods of Mean Score and Ranking Agreement Factor are applied to calculate the sorting order and analyze the consistency of market survey data. The results show that 17 factors concerning owner's engineering capabilities, owner's preferences to project construction, project properties, and lump-sum contracting market conditions exert a profound influence on the decision-making of lump-sum contracting project delivery methods. Finally, countermeasures and suggestions are proposed to promote a rapid and sound development of lump-sum contracting system in Chinese construction industry.","PeriodicalId":131337,"journal":{"name":"5th International Conference on Computer Sciences and Convergence Information Technology","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Key factors influencing the decision-making of lump-sum contracting project delivery methods in China\",\"authors\":\"Wang Xuetong\",\"doi\":\"10.1109/ICCIT.2010.5711165\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"20 factors are selected to frame a primary factor set from 38 factors obtained through literature study. The methods of Mean Score and Ranking Agreement Factor are applied to calculate the sorting order and analyze the consistency of market survey data. The results show that 17 factors concerning owner's engineering capabilities, owner's preferences to project construction, project properties, and lump-sum contracting market conditions exert a profound influence on the decision-making of lump-sum contracting project delivery methods. Finally, countermeasures and suggestions are proposed to promote a rapid and sound development of lump-sum contracting system in Chinese construction industry.\",\"PeriodicalId\":131337,\"journal\":{\"name\":\"5th International Conference on Computer Sciences and Convergence Information Technology\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"5th International Conference on Computer Sciences and Convergence Information Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCIT.2010.5711165\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"5th International Conference on Computer Sciences and Convergence Information Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCIT.2010.5711165","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

从文献研究得到的38个因子中选取20个因子构成主因子集。采用均分法和排序一致因子法计算市场调查数据的排序顺序,分析市场调查数据的一致性。结果表明,业主的工程能力、业主对工程建设的偏好、工程性质、总承包市场条件等17个因素对总承包工程交付方式的决策产生了深远的影响。最后,提出了促进我国建筑业总承包制度快速健康发展的对策建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Key factors influencing the decision-making of lump-sum contracting project delivery methods in China
20 factors are selected to frame a primary factor set from 38 factors obtained through literature study. The methods of Mean Score and Ranking Agreement Factor are applied to calculate the sorting order and analyze the consistency of market survey data. The results show that 17 factors concerning owner's engineering capabilities, owner's preferences to project construction, project properties, and lump-sum contracting market conditions exert a profound influence on the decision-making of lump-sum contracting project delivery methods. Finally, countermeasures and suggestions are proposed to promote a rapid and sound development of lump-sum contracting system in Chinese construction industry.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Quality factors of business value and service level measurement for SOA Study on the inter-organizational tacit knowledge transfer network Network joining algorithm for mobile nodes in ubiquitous sensor networks Network security for virtual machine in cloud computing Action recognition using hybrid spatio-temporal bag-of-features
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1