{"title":"创业挑战赛","authors":"S. Akhtar","doi":"10.1108/02580540210793310","DOIUrl":null,"url":null,"abstract":"Start-up during 2002 of the Gebze, Adapazari and Izmir combined cycle power plants in Turkey revealed over-pressure at the boiler feedwater pump discharge. The over-pressure was caused by grid over-frequency and cold water used at start-up and required an innovative solution to ensure that the plants could continue to operate reliably.","PeriodicalId":260015,"journal":{"name":"Power engineering international","volume":"133 3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Start-up challenge\",\"authors\":\"S. Akhtar\",\"doi\":\"10.1108/02580540210793310\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Start-up during 2002 of the Gebze, Adapazari and Izmir combined cycle power plants in Turkey revealed over-pressure at the boiler feedwater pump discharge. The over-pressure was caused by grid over-frequency and cold water used at start-up and required an innovative solution to ensure that the plants could continue to operate reliably.\",\"PeriodicalId\":260015,\"journal\":{\"name\":\"Power engineering international\",\"volume\":\"133 3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Power engineering international\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/02580540210793310\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Power engineering international","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/02580540210793310","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Start-up during 2002 of the Gebze, Adapazari and Izmir combined cycle power plants in Turkey revealed over-pressure at the boiler feedwater pump discharge. The over-pressure was caused by grid over-frequency and cold water used at start-up and required an innovative solution to ensure that the plants could continue to operate reliably.