{"title":"项目绩效的早期评估:系统动力学返工模型的应用","authors":"T. Walworth, M. Yearworth, J. Davis, Paul J. Davies","doi":"10.1109/SysCon.2013.6549883","DOIUrl":null,"url":null,"abstract":"We address the problem of rework in complex project management by the use of System Dynamics modeling and estimated planned performance profiles. We propose that early indications of problems arising with a project can be generated by comparing estimated planed performance profiles with actual performance profiles. Estimating project quality for use in the System Dynamics models thus becomes the key challenge to enable the use of this leading indicator. Estimates of project quality based on experience of project type, size and complexity within the organization can be used to parameterize the System Dynamics models to generate model generated estimated planned performance profiles. Early results indicate that the morphology of these profiles shows good agreement with project data emerging from the metrics initiative within Thales UK.","PeriodicalId":218073,"journal":{"name":"2013 IEEE International Systems Conference (SysCon)","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-04-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Early estimation of project performance: The application of a system dynamics rework model\",\"authors\":\"T. Walworth, M. Yearworth, J. Davis, Paul J. Davies\",\"doi\":\"10.1109/SysCon.2013.6549883\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We address the problem of rework in complex project management by the use of System Dynamics modeling and estimated planned performance profiles. We propose that early indications of problems arising with a project can be generated by comparing estimated planed performance profiles with actual performance profiles. Estimating project quality for use in the System Dynamics models thus becomes the key challenge to enable the use of this leading indicator. Estimates of project quality based on experience of project type, size and complexity within the organization can be used to parameterize the System Dynamics models to generate model generated estimated planned performance profiles. Early results indicate that the morphology of these profiles shows good agreement with project data emerging from the metrics initiative within Thales UK.\",\"PeriodicalId\":218073,\"journal\":{\"name\":\"2013 IEEE International Systems Conference (SysCon)\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-04-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 IEEE International Systems Conference (SysCon)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SysCon.2013.6549883\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE International Systems Conference (SysCon)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SysCon.2013.6549883","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

我们通过使用系统动力学建模和估计计划性能概况来解决复杂项目管理中的返工问题。我们建议,可以通过比较估计的计划性能概况与实际性能概况来产生项目中出现的问题的早期迹象。因此,估算用于系统动力学模型的项目质量成为启用这一领先指标的关键挑战。根据组织内项目类型、规模和复杂性的经验对项目质量进行估计,可用于参数化系统动力学模型,以生成模型生成估计的计划性能概要文件。早期结果表明,这些剖面的形态与泰利斯英国公司度量计划中出现的项目数据很好地吻合。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Early estimation of project performance: The application of a system dynamics rework model
We address the problem of rework in complex project management by the use of System Dynamics modeling and estimated planned performance profiles. We propose that early indications of problems arising with a project can be generated by comparing estimated planed performance profiles with actual performance profiles. Estimating project quality for use in the System Dynamics models thus becomes the key challenge to enable the use of this leading indicator. Estimates of project quality based on experience of project type, size and complexity within the organization can be used to parameterize the System Dynamics models to generate model generated estimated planned performance profiles. Early results indicate that the morphology of these profiles shows good agreement with project data emerging from the metrics initiative within Thales UK.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Methodology for designing highly reliable Fault Tolerance Space Systems based on COTS devices Quantitative metrics for improving software performance for an integrated tool platform A method for analyzing architectural drivers when engineering a system architecture Intelligent and defensive framework for decision-making systems-of-systems with applications to healthcare Improving decision-making and management by thinking about the enterprise through multiple dimensions
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1