A. Vergnol, V. Rious, J. Sprooten, B. Robyns, J. Deuse
{"title":"欧洲电网中可再生能源的整合:拥堵管理的市场机制","authors":"A. Vergnol, V. Rious, J. Sprooten, B. Robyns, J. Deuse","doi":"10.1109/EEM.2010.5558732","DOIUrl":null,"url":null,"abstract":"With the increased use of wind energy several Transmission System Operators (TSO) have increasing difficulties for congestion forecasting due to the unpredictable nature of the energy source. To maintain the state of the system within acceptable and secure operating conditions, the TSOs require the curtailment of the production of generators to avoid local congestion on the power grid. These actions reduce the revenue of renewable producers and limit the development of green energy. This is because renewable producers with support schemes bear the inherent cost of congestion when they are re-dispatched. This paper proposes two types of market mechanism that solve the above mentioned problems in case of local congestion. The first mechanism consists in a compensation between renewable producers to limit the amount of redispatched generation in situations when the local congested power grid incorporates only renewable production. If both renewable and conventional productions are connected close to each other, a second mechanism will be used to incentivize competition among power adjustment offers.","PeriodicalId":310310,"journal":{"name":"2010 7th International Conference on the European Energy Market","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Integration of renewable energy in the European power grid: Market mechanism for congestion management\",\"authors\":\"A. Vergnol, V. Rious, J. Sprooten, B. Robyns, J. Deuse\",\"doi\":\"10.1109/EEM.2010.5558732\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With the increased use of wind energy several Transmission System Operators (TSO) have increasing difficulties for congestion forecasting due to the unpredictable nature of the energy source. To maintain the state of the system within acceptable and secure operating conditions, the TSOs require the curtailment of the production of generators to avoid local congestion on the power grid. These actions reduce the revenue of renewable producers and limit the development of green energy. This is because renewable producers with support schemes bear the inherent cost of congestion when they are re-dispatched. This paper proposes two types of market mechanism that solve the above mentioned problems in case of local congestion. The first mechanism consists in a compensation between renewable producers to limit the amount of redispatched generation in situations when the local congested power grid incorporates only renewable production. If both renewable and conventional productions are connected close to each other, a second mechanism will be used to incentivize competition among power adjustment offers.\",\"PeriodicalId\":310310,\"journal\":{\"name\":\"2010 7th International Conference on the European Energy Market\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-06-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 7th International Conference on the European Energy Market\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEM.2010.5558732\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 7th International Conference on the European Energy Market","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2010.5558732","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Integration of renewable energy in the European power grid: Market mechanism for congestion management
With the increased use of wind energy several Transmission System Operators (TSO) have increasing difficulties for congestion forecasting due to the unpredictable nature of the energy source. To maintain the state of the system within acceptable and secure operating conditions, the TSOs require the curtailment of the production of generators to avoid local congestion on the power grid. These actions reduce the revenue of renewable producers and limit the development of green energy. This is because renewable producers with support schemes bear the inherent cost of congestion when they are re-dispatched. This paper proposes two types of market mechanism that solve the above mentioned problems in case of local congestion. The first mechanism consists in a compensation between renewable producers to limit the amount of redispatched generation in situations when the local congested power grid incorporates only renewable production. If both renewable and conventional productions are connected close to each other, a second mechanism will be used to incentivize competition among power adjustment offers.