考虑负荷特性互补的主动配电网变电站规划方法

Nan Zheng, Keren Chen, Qiyuan Cai, Yinan Li, Pengjia Shi, Kangli Xiang
{"title":"考虑负荷特性互补的主动配电网变电站规划方法","authors":"Nan Zheng, Keren Chen, Qiyuan Cai, Yinan Li, Pengjia Shi, Kangli Xiang","doi":"10.1109/ACPEE51499.2021.9437113","DOIUrl":null,"url":null,"abstract":"Different types of loads have different peak times for power consumption. Considering complementary of load timing characteristics scientifically can reduce the peak-to-valley load within the power supply range, reduce the substation capacity, and improve the economics of substation planning schemes. However, in the existing substation planning methods, the influence of complementary of load characteristics on the substation planning scheme has not been considered. To this end, a substation planning scheme that considers the load sequence characteristics is proposed. Firstly, with the goal of minimizing the cost of distribution network planning schemes, a substation planning model is established. Secondly, considering the complementarity of load characteristics, a substation power supply range method based on the improved Voronoi diagram is proposed, then an integrated solution method for the substation planning model is presented. Finally, the calculation example shows that considering the complementarity of load characteristics will slightly increase the construction cost of the line, but at the same time effectively reduce the investment and construction capacity of the substation, thereby improving the overall economy of the distribution network planning scheme.","PeriodicalId":127882,"journal":{"name":"2021 6th Asia Conference on Power and Electrical Engineering (ACPEE)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Active Distribution Network Substation Planning Method Considering Complementation of Load Characteristic\",\"authors\":\"Nan Zheng, Keren Chen, Qiyuan Cai, Yinan Li, Pengjia Shi, Kangli Xiang\",\"doi\":\"10.1109/ACPEE51499.2021.9437113\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Different types of loads have different peak times for power consumption. Considering complementary of load timing characteristics scientifically can reduce the peak-to-valley load within the power supply range, reduce the substation capacity, and improve the economics of substation planning schemes. However, in the existing substation planning methods, the influence of complementary of load characteristics on the substation planning scheme has not been considered. To this end, a substation planning scheme that considers the load sequence characteristics is proposed. Firstly, with the goal of minimizing the cost of distribution network planning schemes, a substation planning model is established. Secondly, considering the complementarity of load characteristics, a substation power supply range method based on the improved Voronoi diagram is proposed, then an integrated solution method for the substation planning model is presented. Finally, the calculation example shows that considering the complementarity of load characteristics will slightly increase the construction cost of the line, but at the same time effectively reduce the investment and construction capacity of the substation, thereby improving the overall economy of the distribution network planning scheme.\",\"PeriodicalId\":127882,\"journal\":{\"name\":\"2021 6th Asia Conference on Power and Electrical Engineering (ACPEE)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 6th Asia Conference on Power and Electrical Engineering (ACPEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ACPEE51499.2021.9437113\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 6th Asia Conference on Power and Electrical Engineering (ACPEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ACPEE51499.2021.9437113","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

不同类型的负载具有不同的功耗峰值时间。科学考虑负荷时序特性的互补性,可以降低供电范围内的峰谷负荷,降低变电站容量,提高变电站规划方案的经济性。然而,在现有的变电站规划方法中,没有考虑负荷特性互补对变电站规划方案的影响。为此,提出了一种考虑负荷序列特性的变电站规划方案。首先,以配电网规划方案成本最小为目标,建立了变电站规划模型。其次,考虑负荷特性的互补性,提出了一种基于改进Voronoi图的变电站供电范围法,并给出了变电站规划模型的综合求解方法。最后,算例表明,考虑负荷特性的互补性会略微增加线路的建设成本,但同时有效降低变电站的投资和建设能力,从而提高配电网规划方案的整体经济性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Active Distribution Network Substation Planning Method Considering Complementation of Load Characteristic
Different types of loads have different peak times for power consumption. Considering complementary of load timing characteristics scientifically can reduce the peak-to-valley load within the power supply range, reduce the substation capacity, and improve the economics of substation planning schemes. However, in the existing substation planning methods, the influence of complementary of load characteristics on the substation planning scheme has not been considered. To this end, a substation planning scheme that considers the load sequence characteristics is proposed. Firstly, with the goal of minimizing the cost of distribution network planning schemes, a substation planning model is established. Secondly, considering the complementarity of load characteristics, a substation power supply range method based on the improved Voronoi diagram is proposed, then an integrated solution method for the substation planning model is presented. Finally, the calculation example shows that considering the complementarity of load characteristics will slightly increase the construction cost of the line, but at the same time effectively reduce the investment and construction capacity of the substation, thereby improving the overall economy of the distribution network planning scheme.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Transient Stability Emergency Control Based on Real-time Power Angle Trajectory Fitting Topology Identification Method for Primary Distribution Network with Limited Smart Meter Data The Steady State Limits Application of 18-pulse Rectifier in Aircraft Radar Power Supply System Yardstick motivation evaluation method for investment of distribution network A Power and Load Optimization Scheduling Model based on Flexible Thermal Load Participating in Assisted Peak Regulation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1