利用SPV分布式发电的技术、财务和环境影响:以IUG校园480kWp混合SPV微型电网为例

Eng. Zeyad El-Ghussain, hanibal Al-Najjar, Eng. Wisam Sakallah
{"title":"利用SPV分布式发电的技术、财务和环境影响:以IUG校园480kWp混合SPV微型电网为例","authors":"Eng. Zeyad El-Ghussain, hanibal Al-Najjar, Eng. Wisam Sakallah","doi":"10.1109/ICEPE-P51568.2021.9423484","DOIUrl":null,"url":null,"abstract":"In this paper, technical, financial and environmental impacts of implementing a decentralized SPV Distributed Generation (SPVDG) system are addressed. Since the beginning of2020, the IUG was retrofitted by a Building Applied Photovoltaic (BAPV) power system constituting a hybrid SPV mini-grid as a partial green solution to the frequent grid outages. The hybrid SPV mini-grid is composed of 480kWp rooftop SPV as an intermittent Renewable Energy Source (RES) which synchronizes either with two on-site diesel generator units in island mode or with the centralized macro-grid in grid-tied mode through Net Energy Metering (NEM) agreement with GEDCo for billing purposes. Technically, the system is found to be resilient and capable of supplying electric power to essential loads at IUG campus efficiently. It was found that the aggregate SPV system is capable of generating a total of approximately 13GWh over an assumed 20 years project lifetime. It was found that it can also increase the overall electrical system efficiency by reducing the LV electrical technical losses and curtailing the need for additional grid rehabilitation investments. Financially, the project’s capital cost was approximately 0.6 MUSD. The Levelized Cost of Energy (LCOE) throughout the lifetime of the project was found to be about 0.04$/kWh which is competitive compared with the GEDCo per unit energy price. The diesel fuel consumption was minimized and the energy bill from GEDCo was lowered. Accordingly, it was found that the project shall recover its capital cost within the first three years of operation. Environmentally, the system shall dramatically mitigate the environmental impacts by avoiding about 8000 tons of CO2 emissions over the lifetime of the project which is a substantial amount of Green House Gas (GHG) emissions reductions.","PeriodicalId":347169,"journal":{"name":"2021 International Conference on Electric Power Engineering – Palestine (ICEPE- P)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Technical, Financial and Environmental Impacts of Utilizing SPV Distributed Generation: A Case Study for 480kWp Hybrid SPV Mini-Grid at IUG Campus\",\"authors\":\"Eng. Zeyad El-Ghussain, hanibal Al-Najjar, Eng. Wisam Sakallah\",\"doi\":\"10.1109/ICEPE-P51568.2021.9423484\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, technical, financial and environmental impacts of implementing a decentralized SPV Distributed Generation (SPVDG) system are addressed. Since the beginning of2020, the IUG was retrofitted by a Building Applied Photovoltaic (BAPV) power system constituting a hybrid SPV mini-grid as a partial green solution to the frequent grid outages. The hybrid SPV mini-grid is composed of 480kWp rooftop SPV as an intermittent Renewable Energy Source (RES) which synchronizes either with two on-site diesel generator units in island mode or with the centralized macro-grid in grid-tied mode through Net Energy Metering (NEM) agreement with GEDCo for billing purposes. Technically, the system is found to be resilient and capable of supplying electric power to essential loads at IUG campus efficiently. It was found that the aggregate SPV system is capable of generating a total of approximately 13GWh over an assumed 20 years project lifetime. It was found that it can also increase the overall electrical system efficiency by reducing the LV electrical technical losses and curtailing the need for additional grid rehabilitation investments. Financially, the project’s capital cost was approximately 0.6 MUSD. The Levelized Cost of Energy (LCOE) throughout the lifetime of the project was found to be about 0.04$/kWh which is competitive compared with the GEDCo per unit energy price. The diesel fuel consumption was minimized and the energy bill from GEDCo was lowered. Accordingly, it was found that the project shall recover its capital cost within the first three years of operation. Environmentally, the system shall dramatically mitigate the environmental impacts by avoiding about 8000 tons of CO2 emissions over the lifetime of the project which is a substantial amount of Green House Gas (GHG) emissions reductions.\",\"PeriodicalId\":347169,\"journal\":{\"name\":\"2021 International Conference on Electric Power Engineering – Palestine (ICEPE- P)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-03-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 International Conference on Electric Power Engineering – Palestine (ICEPE- P)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICEPE-P51568.2021.9423484\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 International Conference on Electric Power Engineering – Palestine (ICEPE- P)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEPE-P51568.2021.9423484","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文讨论了实现分散式SPV分布式发电(SPVDG)系统的技术、财务和环境影响。自2020年初以来,IUG通过建筑应用光伏(BAPV)电力系统进行了改造,该系统构成了一个混合SPV微型电网,作为频繁停电的部分绿色解决方案。混合SPV微型电网由480千瓦时的屋顶SPV作为间歇性可再生能源(RES)组成,它可以通过孤岛模式与两台现场柴油发电机组同步,也可以通过与GEDCo签订的净能源计量(NEM)协议与并网模式下的中央宏观电网同步计费。从技术上讲,该系统具有弹性,能够有效地为IUG校园的基本负载提供电力。研究发现,在假设的20年项目寿命期内,综合SPV系统能够产生总计约13GWh的电力。研究发现,它还可以通过减少低压电力技术损失和减少额外的电网修复投资需求来提高整个电力系统的效率。在财务上,该项目的资本成本约为0.6亿美元。项目整个生命周期的平准化能源成本(LCOE)约为0.04美元/千瓦时,与GEDCo单位能源价格相比具有竞争力。柴油的消耗降到最低,GEDCo的能源账单也降低了。因此,发现该项目将在开始运作的头三年内收回其资本成本。在环境方面,该系统将显著减轻环境影响,在项目的整个生命周期内避免约8000吨二氧化碳排放,这是一笔可观的温室气体(GHG)减排。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Technical, Financial and Environmental Impacts of Utilizing SPV Distributed Generation: A Case Study for 480kWp Hybrid SPV Mini-Grid at IUG Campus
In this paper, technical, financial and environmental impacts of implementing a decentralized SPV Distributed Generation (SPVDG) system are addressed. Since the beginning of2020, the IUG was retrofitted by a Building Applied Photovoltaic (BAPV) power system constituting a hybrid SPV mini-grid as a partial green solution to the frequent grid outages. The hybrid SPV mini-grid is composed of 480kWp rooftop SPV as an intermittent Renewable Energy Source (RES) which synchronizes either with two on-site diesel generator units in island mode or with the centralized macro-grid in grid-tied mode through Net Energy Metering (NEM) agreement with GEDCo for billing purposes. Technically, the system is found to be resilient and capable of supplying electric power to essential loads at IUG campus efficiently. It was found that the aggregate SPV system is capable of generating a total of approximately 13GWh over an assumed 20 years project lifetime. It was found that it can also increase the overall electrical system efficiency by reducing the LV electrical technical losses and curtailing the need for additional grid rehabilitation investments. Financially, the project’s capital cost was approximately 0.6 MUSD. The Levelized Cost of Energy (LCOE) throughout the lifetime of the project was found to be about 0.04$/kWh which is competitive compared with the GEDCo per unit energy price. The diesel fuel consumption was minimized and the energy bill from GEDCo was lowered. Accordingly, it was found that the project shall recover its capital cost within the first three years of operation. Environmentally, the system shall dramatically mitigate the environmental impacts by avoiding about 8000 tons of CO2 emissions over the lifetime of the project which is a substantial amount of Green House Gas (GHG) emissions reductions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Hybrid energy system for Dier El Balah quarantine center in Gaza Strip, Palestine Sliding Mode Control of AC/DC Bridgeless Converter using Piezoelectric Energy Harvesting System Performance Comparison of Different Manufacturers Solar PV Modules Used in Gaza Strip The Effect of Tilting a PV Array by Monthly or Seasonal Optimal Tilt Angles on Energy Yield of a Solar PV System A Low-cost Solar System for Freezers without Back-up Batteries
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1