{"title":"PROJECT PLANNING MAINDAM PADA PROYEK PEMBANGUNAN BENDUNGAN BENDO LANJUTAN KABUPATEN PONOROGO","authors":"Moch. Hafidz Al Basar, Moch. Khamim, Suselo Utoyo","doi":"10.55404/jos-mrk.2021.02.03.292-297","DOIUrl":null,"url":null,"abstract":"The Construction Project of the Advanced Bendo Main Dam in Ponorogo is a project belonging to the Ministry of PUPR Director General of Water Resources BBWS Bengawan Solo SNVT Dam Construction of PPK Dam 1. This project aims to meet the needs of water and flood control in Ponorogo District because the area is hit by drought and often experiences flooding. Maximum utilization of water resources can greatly help various aspects of life. One form of maximum utilization of water resources is to build dams. The dam functions as a reservoir for water from the river which is collected and used to support activities in the community. The water that has been stored in the dam can be used to irrigate rice fields, hydropower, control floods, and of course as raw water reserves during the dry season. The right project planning is needed to realize the project on time, cost, and quality. The project planning discussion includes : (1) strategy implementation method, (2) quality plan, (3) K3, (4) project scheduling, (5) budgeting. The data needed in the preparation of Project Planning are project drawings, work plans and requirements, list of unit prices for wages, tools, and materials in Ponorogo 2020. In preparing the work schedule, the author using the Microsoft Project 2013 program and for project costs using the Microsoft Excel 2010 program. The results obtained are: (1) using the zoning method by dividing into 2 zones, (2) quality control, planning based on the quality plan and each of work items are reffering to technical specification and quality target (3) wearing personal protective equipment and placing work signs, (4) the project implementation is carried out within 405 working days, (5) at a cost of Rp 259.030.729.253,293.","PeriodicalId":337938,"journal":{"name":"Jurnal JOS-MRK","volume":"12 6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal JOS-MRK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55404/jos-mrk.2021.02.03.292-297","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Ponorogo先进本多主坝建设项目是属于PUPR部水资源总监BBWS Bengawan Solo SNVT大坝建设PPK 1号大坝的项目。该项目旨在满足Ponorogo地区的水和防洪需求,因为该地区经常遭受干旱和洪水的袭击。最大限度地利用水资源可以极大地帮助生活的各个方面。最大限度地利用水资源的一种形式是修建水坝。大坝的功能是作为一个水库,从河流中收集水并用于支持社区活动。储存在大坝里的水可以用来灌溉稻田、水力发电、控制洪水,当然也可以作为旱季的原水储备。正确的项目计划是按时、按成本和按质量实现项目的必要条件。项目计划讨论包括:(1)战略实施方法;(2)质量计划;(3)K3;(4)项目进度安排;(5)预算编制。编制《项目规划》所需的数据是《Ponorogo 2020》中的项目图纸、工作计划和要求、工资单价清单、工具和材料。在编制工作进度表时,作者使用了Microsoft Project 2013程序,对项目费用使用了Microsoft Excel 2010程序。得到的结果是:(1)采用分区法,划分为2个分区;(2)质量控制,根据质量计划进行规划,各工作项目参照技术规范和质量目标进行规划;(3)穿戴个人防护装备,放置工作标志;(4)项目实施时间为405个工作日;(5)成本为Rp 259.030.729.253,293。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
PROJECT PLANNING MAINDAM PADA PROYEK PEMBANGUNAN BENDUNGAN BENDO LANJUTAN KABUPATEN PONOROGO
The Construction Project of the Advanced Bendo Main Dam in Ponorogo is a project belonging to the Ministry of PUPR Director General of Water Resources BBWS Bengawan Solo SNVT Dam Construction of PPK Dam 1. This project aims to meet the needs of water and flood control in Ponorogo District because the area is hit by drought and often experiences flooding. Maximum utilization of water resources can greatly help various aspects of life. One form of maximum utilization of water resources is to build dams. The dam functions as a reservoir for water from the river which is collected and used to support activities in the community. The water that has been stored in the dam can be used to irrigate rice fields, hydropower, control floods, and of course as raw water reserves during the dry season. The right project planning is needed to realize the project on time, cost, and quality. The project planning discussion includes : (1) strategy implementation method, (2) quality plan, (3) K3, (4) project scheduling, (5) budgeting. The data needed in the preparation of Project Planning are project drawings, work plans and requirements, list of unit prices for wages, tools, and materials in Ponorogo 2020. In preparing the work schedule, the author using the Microsoft Project 2013 program and for project costs using the Microsoft Excel 2010 program. The results obtained are: (1) using the zoning method by dividing into 2 zones, (2) quality control, planning based on the quality plan and each of work items are reffering to technical specification and quality target (3) wearing personal protective equipment and placing work signs, (4) the project implementation is carried out within 405 working days, (5) at a cost of Rp 259.030.729.253,293.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ANALISIS STABILITAS TUBUH BENDUNGAN PADA BENDUNGAN SEMANTOK KABUPATEN NGANJUK PROVINSI JAWA TIMUR ANALISA PERPANJANGAN LANDASAN PACU PADA BANDAR UDARA ABDULRACHMAN SALEH MALANG (STA 2+250 – STA 3+000) EVALUASI DAN PERENCANAAN ULANG SISTEM JARINGAN DRAINASE KECAMATAN KARTOHARJO KOTA MADIUN ANALISA KERUSAKAN JALAN MENGGUNAKAN METODE BINA MARGA PADA JALAN RAYA JERU – JALAN RAYA TUMPANG KABUPATEN MALANG PERENCANAAN ULANG STRUKTUR ATAS DAN RAB GEDUNG KULIAH AKN PUTRA SANG FAJAR
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1