{"title":"通过内部和精益设计解锁生产设备中的石油生产,显著节省成本","authors":"Auttapon Rungchaya, Pimpisa Pechvijitra, Arak Yongchooyot, Kantkanit Watanakun, Saranee Nitayaphan, Anoma Chutrapukdeekul","doi":"10.2523/iptc-22732-ea","DOIUrl":null,"url":null,"abstract":"\n \n \n Currently, the crude oil from outstations (O/STN) wellsite contributes more than 30% of the total Sirikit Oilfileds (S1) production and will be increased to 50% of total production of Sirikit Oilfileds. According to the production profile of the NTM-A areas, NTM-A Onshore permanent production facilities are more likely to handle the higher gross production rate to up 20,000 BPD. Thus, it is essential to debottleneck NTM-A to handle the new gross production rate.\n \n \n \n The existing capacity of NTM-A permanent production facilities is 13,000 BPD. In order to debottleneck NTM-A's capacity to 20,000 BPD, the capacities of the production separators, the indirect gas fired heaters, the storage tanks, the water injection system, and the utilities were re-verified at different percent water cuts. To minimize the project cost, all of new equipment was designed by our in-house engineering team. Lessons learned from the previous projects were taken into account and incorporated with the new design.\n","PeriodicalId":283978,"journal":{"name":"Day 1 Wed, March 01, 2023","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Unlock Oil Production in Production Facility by in House and Lean Design with Significant Cost Saving\",\"authors\":\"Auttapon Rungchaya, Pimpisa Pechvijitra, Arak Yongchooyot, Kantkanit Watanakun, Saranee Nitayaphan, Anoma Chutrapukdeekul\",\"doi\":\"10.2523/iptc-22732-ea\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n \\n \\n Currently, the crude oil from outstations (O/STN) wellsite contributes more than 30% of the total Sirikit Oilfileds (S1) production and will be increased to 50% of total production of Sirikit Oilfileds. According to the production profile of the NTM-A areas, NTM-A Onshore permanent production facilities are more likely to handle the higher gross production rate to up 20,000 BPD. Thus, it is essential to debottleneck NTM-A to handle the new gross production rate.\\n \\n \\n \\n The existing capacity of NTM-A permanent production facilities is 13,000 BPD. In order to debottleneck NTM-A's capacity to 20,000 BPD, the capacities of the production separators, the indirect gas fired heaters, the storage tanks, the water injection system, and the utilities were re-verified at different percent water cuts. To minimize the project cost, all of new equipment was designed by our in-house engineering team. Lessons learned from the previous projects were taken into account and incorporated with the new design.\\n\",\"PeriodicalId\":283978,\"journal\":{\"name\":\"Day 1 Wed, March 01, 2023\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Wed, March 01, 2023\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2523/iptc-22732-ea\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Wed, March 01, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/iptc-22732-ea","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Unlock Oil Production in Production Facility by in House and Lean Design with Significant Cost Saving
Currently, the crude oil from outstations (O/STN) wellsite contributes more than 30% of the total Sirikit Oilfileds (S1) production and will be increased to 50% of total production of Sirikit Oilfileds. According to the production profile of the NTM-A areas, NTM-A Onshore permanent production facilities are more likely to handle the higher gross production rate to up 20,000 BPD. Thus, it is essential to debottleneck NTM-A to handle the new gross production rate.
The existing capacity of NTM-A permanent production facilities is 13,000 BPD. In order to debottleneck NTM-A's capacity to 20,000 BPD, the capacities of the production separators, the indirect gas fired heaters, the storage tanks, the water injection system, and the utilities were re-verified at different percent water cuts. To minimize the project cost, all of new equipment was designed by our in-house engineering team. Lessons learned from the previous projects were taken into account and incorporated with the new design.