通过内部和精益设计解锁生产设备中的石油生产,显著节省成本

Auttapon Rungchaya, Pimpisa Pechvijitra, Arak Yongchooyot, Kantkanit Watanakun, Saranee Nitayaphan, Anoma Chutrapukdeekul
{"title":"通过内部和精益设计解锁生产设备中的石油生产,显著节省成本","authors":"Auttapon Rungchaya, Pimpisa Pechvijitra, Arak Yongchooyot, Kantkanit Watanakun, Saranee Nitayaphan, Anoma Chutrapukdeekul","doi":"10.2523/iptc-22732-ea","DOIUrl":null,"url":null,"abstract":"\n \n \n Currently, the crude oil from outstations (O/STN) wellsite contributes more than 30% of the total Sirikit Oilfileds (S1) production and will be increased to 50% of total production of Sirikit Oilfileds. According to the production profile of the NTM-A areas, NTM-A Onshore permanent production facilities are more likely to handle the higher gross production rate to up 20,000 BPD. Thus, it is essential to debottleneck NTM-A to handle the new gross production rate.\n \n \n \n The existing capacity of NTM-A permanent production facilities is 13,000 BPD. In order to debottleneck NTM-A's capacity to 20,000 BPD, the capacities of the production separators, the indirect gas fired heaters, the storage tanks, the water injection system, and the utilities were re-verified at different percent water cuts. To minimize the project cost, all of new equipment was designed by our in-house engineering team. Lessons learned from the previous projects were taken into account and incorporated with the new design.\n","PeriodicalId":283978,"journal":{"name":"Day 1 Wed, March 01, 2023","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Unlock Oil Production in Production Facility by in House and Lean Design with Significant Cost Saving\",\"authors\":\"Auttapon Rungchaya, Pimpisa Pechvijitra, Arak Yongchooyot, Kantkanit Watanakun, Saranee Nitayaphan, Anoma Chutrapukdeekul\",\"doi\":\"10.2523/iptc-22732-ea\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n \\n \\n Currently, the crude oil from outstations (O/STN) wellsite contributes more than 30% of the total Sirikit Oilfileds (S1) production and will be increased to 50% of total production of Sirikit Oilfileds. According to the production profile of the NTM-A areas, NTM-A Onshore permanent production facilities are more likely to handle the higher gross production rate to up 20,000 BPD. Thus, it is essential to debottleneck NTM-A to handle the new gross production rate.\\n \\n \\n \\n The existing capacity of NTM-A permanent production facilities is 13,000 BPD. In order to debottleneck NTM-A's capacity to 20,000 BPD, the capacities of the production separators, the indirect gas fired heaters, the storage tanks, the water injection system, and the utilities were re-verified at different percent water cuts. To minimize the project cost, all of new equipment was designed by our in-house engineering team. Lessons learned from the previous projects were taken into account and incorporated with the new design.\\n\",\"PeriodicalId\":283978,\"journal\":{\"name\":\"Day 1 Wed, March 01, 2023\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Wed, March 01, 2023\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2523/iptc-22732-ea\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Wed, March 01, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/iptc-22732-ea","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目前,来自外站(O/STN)井场的原油贡献了诗丽吉油田(S1)总产量的30%以上,并将增加到诗丽吉油田总产量的50%。根据NTM-A地区的生产概况,NTM-A陆上永久性生产设施更有可能处理高达2万桶/天的总产量。因此,有必要对NTM-A进行去瓶颈化处理,以处理新的总生产率。NTM-A永久生产设施的现有产能为13000桶/天。为了将NTM-A的产能提高到20000桶/天,生产分离器、间接燃气加热器、储罐、注水系统和公用设施的产能在不同含水率下进行了重新验证。为了最大限度地降低项目成本,所有新设备都是由我们的内部工程团队设计的。从以前的项目中吸取的经验教训被考虑并融入到新的设计中。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Unlock Oil Production in Production Facility by in House and Lean Design with Significant Cost Saving
Currently, the crude oil from outstations (O/STN) wellsite contributes more than 30% of the total Sirikit Oilfileds (S1) production and will be increased to 50% of total production of Sirikit Oilfileds. According to the production profile of the NTM-A areas, NTM-A Onshore permanent production facilities are more likely to handle the higher gross production rate to up 20,000 BPD. Thus, it is essential to debottleneck NTM-A to handle the new gross production rate. The existing capacity of NTM-A permanent production facilities is 13,000 BPD. In order to debottleneck NTM-A's capacity to 20,000 BPD, the capacities of the production separators, the indirect gas fired heaters, the storage tanks, the water injection system, and the utilities were re-verified at different percent water cuts. To minimize the project cost, all of new equipment was designed by our in-house engineering team. Lessons learned from the previous projects were taken into account and incorporated with the new design.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The Proper Well Spacings – A Supplementary Method to Maximize The Gulf of Thailand Development Project Value Seismic Driven Machine Learning to Improve Precision and Accelerate Screening Shallow Gas Potentials in Tunu Shallow Gas Zone, Mahakam Delta, Indonesia Rejuvenating Waterflood Reservoir in a Complex Geological Setting of a Matured Brown Field Intelligent Prediction of Downhole Drillstring Vibrations in Horizontal Wells by Employing Artificial Neural Network Sand Fill Clean-Out on Wireline Enables Access to Additional Perforation Zones in Gas Well Producer
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1