{"title":"autosace -自动检查波塞冬","authors":"G. W. Schultz, J. M. Colebank","doi":"10.1145/1465611.1465699","DOIUrl":null,"url":null,"abstract":"A major difficulty encountered in the manufacture of complex systems is the insurance of specification compliance of sub-assemblies at numerous points in the manufacturing process. An additional problem is encountered when historical data concerning any particular specification failure is required.","PeriodicalId":265740,"journal":{"name":"AFIPS '67 (Fall)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1967-11-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"AutoSACE-automatic checkout for Poseidon\",\"authors\":\"G. W. Schultz, J. M. Colebank\",\"doi\":\"10.1145/1465611.1465699\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A major difficulty encountered in the manufacture of complex systems is the insurance of specification compliance of sub-assemblies at numerous points in the manufacturing process. An additional problem is encountered when historical data concerning any particular specification failure is required.\",\"PeriodicalId\":265740,\"journal\":{\"name\":\"AFIPS '67 (Fall)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1967-11-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"AFIPS '67 (Fall)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/1465611.1465699\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"AFIPS '67 (Fall)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/1465611.1465699","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A major difficulty encountered in the manufacture of complex systems is the insurance of specification compliance of sub-assemblies at numerous points in the manufacturing process. An additional problem is encountered when historical data concerning any particular specification failure is required.