{"title":"诉讼","authors":"John Denis-Smith, Peter J. Hurst","doi":"10.1093/oso/9780198832805.003.0021","DOIUrl":null,"url":null,"abstract":"This chapter deals with construction litigation as the litigation of claims by or against contractors, sub-contractors, and construction professionals that usually takes place in the Technology and Construction Court (TCC). It explains that the TCC is a branch of the Queen’s Bench Division of the High Court. It also mentions the TCC Guide that provides guidance as to the practices of the court and sets out information specific to proceedings in the TCC. This chapter cites rule 60.1(2) of the Civil Procedure Rules, which identifies a claim heard in the TCC as a ‘TCC claim’ that involves issues or questions that are technically complex. It looks at the non-exhaustive list of the categories of cases tried by the TCC that is set out in the Practice Direction.","PeriodicalId":296429,"journal":{"name":"Wilmot-Smith on Construction Contracts","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Litigation\",\"authors\":\"John Denis-Smith, Peter J. Hurst\",\"doi\":\"10.1093/oso/9780198832805.003.0021\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This chapter deals with construction litigation as the litigation of claims by or against contractors, sub-contractors, and construction professionals that usually takes place in the Technology and Construction Court (TCC). It explains that the TCC is a branch of the Queen’s Bench Division of the High Court. It also mentions the TCC Guide that provides guidance as to the practices of the court and sets out information specific to proceedings in the TCC. This chapter cites rule 60.1(2) of the Civil Procedure Rules, which identifies a claim heard in the TCC as a ‘TCC claim’ that involves issues or questions that are technically complex. It looks at the non-exhaustive list of the categories of cases tried by the TCC that is set out in the Practice Direction.\",\"PeriodicalId\":296429,\"journal\":{\"name\":\"Wilmot-Smith on Construction Contracts\",\"volume\":\"50 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Wilmot-Smith on Construction Contracts\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1093/oso/9780198832805.003.0021\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Wilmot-Smith on Construction Contracts","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1093/oso/9780198832805.003.0021","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本章涉及的建筑诉讼是指通常在技术和建筑法院(TCC)进行的由承包商、分包商和建筑专业人员提出或针对承包商、分包商和建筑专业人员的索赔诉讼。它解释说,TCC是高等法院女王法官部的一个分支。它还提到了TCC指南,该指南为法院的做法提供了指导,并列出了TCC诉讼的具体信息。本章引用《民事诉讼规则》第60.1(2)条,该规则将在TCC审理的索赔认定为涉及技术上复杂的问题或问题的“TCC索赔”。它会参考《实务指示》中所载的不详尽的审裁处审理的案件类别清单。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Litigation
This chapter deals with construction litigation as the litigation of claims by or against contractors, sub-contractors, and construction professionals that usually takes place in the Technology and Construction Court (TCC). It explains that the TCC is a branch of the Queen’s Bench Division of the High Court. It also mentions the TCC Guide that provides guidance as to the practices of the court and sets out information specific to proceedings in the TCC. This chapter cites rule 60.1(2) of the Civil Procedure Rules, which identifies a claim heard in the TCC as a ‘TCC claim’ that involves issues or questions that are technically complex. It looks at the non-exhaustive list of the categories of cases tried by the TCC that is set out in the Practice Direction.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Injunctions and Specific Performance Contracts: Formation and Interpretation Damages for Breach of Contract Determination or Forfeiture Clauses International Construction Arbitration
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1